Equipment Upgrades
Adding New Modules
1 A) To power down the control unit, pull out the main circuit breaker.
On a PARTNER Plus 220V system, move the on/off switch to the “off” position (“O”).
B) To remove the cover, place one hand on the
|
| handle on the bottom front of the cover and |
|
| place your other hand on the top of the cover. |
| C) | Gently pull the cover up from the bottom and tilt |
|
| it towards the top until it detaches from the |
2 |
| backplane. |
A) | Before you insert the new module, make sure that | |
|
| all 400 (or 200) modules are installed to the |
|
| right of all 206 modules. Also, remember to |
|
| hold down the locking tab and to align the |
|
| dovetail guides on the sides of the modules |
|
| as you insert the new module. |
| B) | Push the module slowly but firmly until it locks |
|
| into place with two snaps, and is attached to |
|
| the rear of the backplane and held in place by |
|
| the locking tab on the bottom of the slot. Do |
|
| not force the module. If it does not insert |
|
| easily, remove the module, clear any |
3 |
| obstruction, and reinsert. |
A) | See “Connecting Lines and Extensions” for | |
|
| instructions on connecting line and/or |
|
| extension jack cords to the new module. |
| B) To power up the control unit, push in the main | |
|
| circuit breaker. |
|
| On a PARTNER Plus 220V system, move the |
|
| on/off switch to the “on” position (“l”). |
4 | Check all green lights on the fronts of the modules. If | |
| all the lights are lit, installation is complete; otherwise: |
A) If a single light is out, power down the control unit, reseat the module, then power up the control unit.
If multiple lights are out, power down the control unit, reseat the first leftmost module that has a light out, then power up the control unit.
B) If the lights are still out, call the appropriate support telephone number as instructed on the inside front cover.
Main
Circuit Breaker
Power
Jack
Handle
Dovetail
Guides
Locking
Tab
Lights
Equipment Upgrades 17