Black Box FX810AE, FX801A, FX802A, FX800AE manual Connecting the antenna to the Campus Pager

Page 14

CAMPUS PAGER

2.Insert the center-loaded antenna connector into the antenna jack on the right side of the Campus Pager. Turn the connector clockwise until the antenna locks in place. For maximum efficiency, extend the antenna to its full length, orient it vertically, and keep it away from walls. See Figure 4-2.

Figure 4-2. Connecting the antenna to the Campus Pager.

3.Mark the positions for the two supplied mounting screws on the wall. The positions should be 5-7/8” apart. Drill the two holes, then thread the two screws into the wall. The screws should extend 1/5”. Do not over-tighten the screws.

4.Align the keyholes on the back of the brackets with the two screws, then push in and press down to secure the Campus Pager to the wall. See Figure 4-3.

16

Image 14
Contents Campus Pager FCC Statement Industry CanadaCampus Pager NOM Statement Trademarks Contents Specifications Important Notes Beware of Electric ShockIntroduction Campus PagerCampus Pager Tone Pager FX801A Vibrating/Tone Pager FX802A Installation Positioning the Campus PagerConnecting the antenna to the Campus Pager Connecting the Campus Pager to the mounted screws Installing/Replacing Pager Batteries Positioning the Antenna Ground WireConnecting Power to the Campus Pager Installing batteries in the pager Storing the System Code Using the Campus PagerOverview Campus Pager system code button Pager ON/OFF Switch Storing the Pager CodeTransmitting a Message Code to a Single Pager Transmitting a Message Code to All System Pagers Reviewing Stored Message Codes Receiving a Message Code with the Tone PagerReceiving a Message Code with the Vibrating/Tone Pager Service Information Copyright 1996. Black Box Corporation. All rights reserved