Bard W**H*D, S**H*D, T**H*D installation instructions Crv

Page 13

FIGURE 9

HEAT PUMP WITH DEHUMIDIFICATION SEQUENCE & OPTIONAL MFAD, CRV & ERV VENTILATION

PACKAGING USING A NON-PROGRAMMABLE THERMOSTAT (NO OCCUPIED SIGNAL)

Low Voltage Wiring Diagram

Thermostat

C

G R Rc Y

E AUX O/B

Bard part #8403-058

 

 

1

 

L1 Stage Cool

2 Stage Heat

"L" is constant 24V output when thermostat is in Em Heat mode

24V Low Voltage

C G R

Y1

Y E W2 B W1 W3 DH O1

L

Terminal Block

 

 

 

 

Unit

1

 

 

Red

 

 

2

 

Orange

CRV

 

Brown/White

Black

 

 

ERV

 

4

 

Ventilation

 

 

 

Packages

Black

 

MFAD

RED

 

 

 

3

 

 

6

5

3

 

 

4

Electronic Humidistat

 

 

 

 

 

Bard part #8403-047

 

 

 

 

 

 

 

Red

 

 

Yellow

 

 

Mechanical Humidistat

 

 

 

Bard part #8403-038

MIS-2638 C

1Factory Jumper Installed.

2Add jumper, ventilation will be active whenever blower operates.

3Jumper needs to be added.

4Orange wire is not connected.

Manual

2100-516H

 

Page

13 of 19

Image 13
Contents Single Stage Heat Pumps LOW Voltage Control Circuit Wiring Contents Wiring LOW Voltage Wiring Thermostat Wire Size Low Voltage Wiring Diagram Low Voltage Wiring Diagram Stage Cool Only if optional CO2 controller is used Low Voltage Wiring Diagram Electronic Programmable Stage Cool Stage Heat Cool CRV Stage Cool 2 Stage Heat WH/SH Heat Pump Connection Diagram WH Unit Low Voltage Term. Strip Thermostat 24V Low Voltage Terminal Block Yellow Black Red Stage Cool Stage Heat Unit