Bard W**H*D, S**H*D, T**H*D installation instructions WH/SH Heat Pump Connection Diagram

Page 15

FIGURE 11

HEAT PUMP WITH CS2000A2

 

 

 

WH/SH HEAT PUMP CONNECTION DIAGRAM

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DO NOT CONNECT "L" UNTIL AFTER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8403-060 CONTROLLER IS CONFIGURED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TO CS2000 = YES

 

 

 

 

 

TEMPERATURE/HUMIDITY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

YELLOW

 

8403-038

 

R

C

 

G

Y1

 

O/B

 

W2

W1/E

 

L

YO/D

 

 

 

 

 

 

 

CONTROLLER BARD P/N 8403-060

 

 

 

 

 

 

 

 

 

 

H600A1014

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HUMIDITY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

 

 

 

 

 

 

CONTROLLER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BLUE

RED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8403-047

 

THERMOSTAT TH5220D1151

 

C

 

G

 

Y

 

O/B

Aux

E

L

R

RC

 

 

6

5

 

 

 

 

 

 

 

 

 

4

3

H200-10-21-10

 

BARD P/N 8403-058

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

 

 

 

 

DEHUMIDSTAT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

IF OPTIONAL VENT PACKAGE IS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

INSTALLED, THE "G" WIRE MUST

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BE CONNECTED TO ASSURE

 

01

C

R

G

 

Y

Y1

B

W1

W2

E

L

 

 

 

 

 

 

 

W3

UNIT 24V

CONTINUOUS BLOWER DURING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TERMINALS

OCCUPIED PERIODS WHEN VENT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SYSTEM IS "ON". THE "G" WIRE

 

 

 

 

 

 

 

 

 

 

1

 

 

 

 

 

 

 

 

 

 

 

MUST ALSO BE CONNECTED

BK

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FOR PRE-PURGE OPERATION

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HUMIDITY CONTROLLER

(SEE STEP 2, FUNCTION SWITCH

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CONNECTIONS USED ONLY

 

SETTINGS).

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BARD VENTILATION

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FOR OPTIONAL DEHUMIDIFICATION

WERV

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CIRCUIT THAT MUST BE FACTORY

PACKAGE (OPTIONAL)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

INSTALLED IN HEAT PUMP

OR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NOTE: IF FACTORY INSTALLED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CRV

 

 

 

 

NC

C

NO

C

NC

 

PWR

 

 

 

 

C

NC

 

 

 

 

DISCONNECT AND TAPE RED

 

BR/W

 

 

 

VENT

HVAC FAN

 

 

 

 

 

 

 

 

 

 

 

 

AND ORANGE WIRES

 

 

 

 

 

 

 

 

 

 

 

 

 

FACTORY JUMPER - SEE

 

R

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SEARCH TIME DETAIL

 

O

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ON PAGE 3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OPTIONAL

 

 

 

 

 

 

 

 

 

 

 

 

-

+

-

+

 

 

 

 

 

 

2

LIGHTING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CONTROL

 

 

 

 

AREA OCCUP.

REM

 

 

PWR

PRECOND DOOR

NO C

NC

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NO

C

NC

-

+

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HVAC

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LIGHTING CONTROL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RELAY NORMALLY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CLOSED CONTACTS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MAN.

1 JUMPER IS FACTORY INSTALLED.

 

 

 

REMOTE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OVERIDE

 

LIGHTING CONTROL CIRCUIT

 

 

 

MOTION

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(24 HRS)

2

MANUAL SWITCH

DETECTOR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

IS OPTIONAL AND FIELD

(OPTIONAL)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SUPPLIED. LIGHTING CONTROL

FIELD SUPPLIED

NORMALLY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RELAY REQUIRES NORMALLY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CS2000A2

 

 

CLOSED CONTACTS AND MUST

 

 

 

OPEN

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BE SIZED ACCORDING TO

 

LIGHTS

CONTACTS

 

 

 

 

 

 

 

 

 

 

ENERGY MONITOR

 

CONTROLLED LOAD.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RECOMMENDED SWITCH SETTINGS SHOWN BELOW

FUNCTION SWITCHES

LEARN

PRE P

MODE

RATE

SEARCH-TIME

N/C

STAGE

AUX

DEMAND 2

DEMAND 1

TEMPERATURE SWITCHES

90

84

81

78

68

65

62

58

54

48

4093-140 L

Manual

2100-516H

 

Page

15 of 19

Image 15
Contents Single Stage Heat Pumps LOW Voltage Control Circuit Wiring Contents Wiring LOW Voltage Wiring Thermostat Wire Size Low Voltage Wiring Diagram Low Voltage Wiring Diagram Stage Cool Only if optional CO2 controller is used Low Voltage Wiring Diagram Electronic Programmable Stage Cool Stage Heat Cool CRV Stage Cool 2 Stage Heat WH/SH Heat Pump Connection Diagram WH Unit Low Voltage Term. Strip Thermostat 24V Low Voltage Terminal Block Yellow Black Red Stage Cool Stage Heat Unit