FIGURE 10
HEAT PUMP WITH DEHUMIDIFICATION SEQUENCE & OPTIONAL MFAD, CRV & ERV VENTILATION
PACKAGING USING A
Low Voltage Wiring Diagram
C | G | R Rc Y | AUX O/B |
Thermostat |
| 1 |
|
#TH5220D1151 |
|
| |
Bard part |
|
|
|
1 | 2 | 3 | 4 |
24V Low Voltage
Terminal Block
C G R | Y1 | Y |
| W2 B W1 W3 | DH | |
|
|
|
|
| 1 |
|
3 |
|
| Red |
|
|
|
| Orange | CRV | Brown/White |
| ||
|
|
| ||||
Black |
|
|
| ERV |
| |
|
|
| Ventilation |
| ||
|
|
|
|
| Packages |
|
Black |
|
|
| MFAD | Red | |
|
|
|
| 2 |
|
|
Electronic Humidistat | 6 | 5 | 3 |
| 4 |
|
|
|
|
|
|
| |
Bard part |
|
|
|
|
|
|
|
|
| Red |
| Yellow |
|
|
|
|
| Mechanical Humidistat |
| |
|
|
|
|
| Bard part |
|
"L" is constant 24V output when thermostat is in Em Heat mode
1 Stage
Cool
E L 2 Stage
Heat
5 | 6 | Optional CO2 | Controller |
|
| ||
|
| Bard part |
O1 E | L | Unit |
1Factory Jumper Installed.
2Jumper needs to be added.
3Connect Orange wire to "G".
Manual | |
Page | 14 of 19 |