Lincoln Electric IM831, 11079 manual Connection of Ranger 3 Phase to Premises Wiring

Page 16

A-9

INSTALLATION

A-9

 

 

 

Figure 1

CONNECTION OF RANGER 3 PHASE TO PREMISES WIRING

240Volt

60 Hz.

3-Wire

Service

240 VOLT

POWER

120 VOLT

COMPANY

120 VOLT

METER

GROUNDED CONDUCTOR

NEUTRAL

BUS

DOUBLE POLE DOUBLE THROW

SWITCH RATING TO BE THE SAME

AS OR GREATER THAN PREMISES

SERVICE OVERCURRENT

PROTECTION.

 

 

40 AMP

 

 

240 VOLT

 

 

DOUBLE

50 AMP, 120/240

 

POLE

 

CIRCUIT

VOLT PLUG

240 VOLT

BREAKER

NEMA TYPE 14-50

 

 

GND

N

N

LOAD

PREMISES

DISCONNECT AND

SERVICE

GROUNDOVERCURRENT PROTECTION

50 AMP, 120/240 VOLT

RECEPTACLENOTE: No. 6 COPPER CONDUCTOR CABLE SEE NATIONAL ELECTRICAL CODE FOR ALTERNATE WIRE

SIZE RECOMMENDATIONS.

WARNING

Connection of RANGER 3 PHASE to premises wiring must be done by a licensed electrician and must comply with the National Electrical Code and all other applicable electrical codes. See the Installation Section for important information about not using the 480V 3 Phase Receptacle for connection to Single Phase Premises Wiring.

RANGER 3 PHASE

Image 16
Contents Ranger Phase Safety California Proposition 65 WarningsElectric Shock can kill Welding Sparks can cause fire or explosion IiiPrécautions DE Sûreté Sûreté Pour Soudage a L’ArcThank You Table of Contents Installation Technical Specifications Ranger 3 Phase K2337-1Height Width Depth Weight Ranger 3 PhaseSafety Precautions Machine GroundingSpark Arrester TowingPRE-OPERATION Service Connection of Lincoln Electric Wire Feeders Angle of OperationLifting High Altitude OperationAdditional Safety Precautions Auxiliary PowerInstructions Welder OperationVolt 3 Phase Receptacle with Ground Ground WireRanger 3 Phase Extension Cord Length Recommendations Gfci Duplex ReceptaclesElectrical Device USE with the Ranger 3 Phase Type Common Electrical Devices Possible ConcernsSimultaneous Welding and Power Auxiliary Power While WeldingStandby Power Connections Connection of Ranger 3 Phase to Premises Wiring Engine Switch OperationGeneral Description Welder Controls Function and OperationPolarity Switch Ranger 3 Phase Approximate Fuel ConsumptionWire Feed Welding Processes Constant Voltage Welding ProcessStick Constant Current Welding TIG Constant Current WeldingStick Auto STARTING/SHUTDOWN Instructions BREAK-IN PeriodStarting the Engine Stopping the EngineAccessories K1745-1 GAS Cylinder HolderWire Feed Recommended EquipmentStick TIGMaintenance Safety PrecautionsRoutine Maintenance Engine OIL Refill Capacities Engine OIL ChangeGfci Receptacle Testing and RESET- Ting Procedure AIR Cleaner and Other MaintenanceOIL Filter Change Engine Adjustments Troubleshooting HOW to USE Troubleshooting GuideYour local Lincoln Authorized Field Service Facility Troubleshooting Diagrams Ranger 3 PhaseEngine Welder M20397 Ranger 3 Phase Precaucion Warnung