NOTES

Replacement of the refrigeration cycle.

1.When replacing refrigeration components, be sure to discharge the refrigerant system using a FreonTM recovery System.

Install a valve for the recovery, before venting the Freon, remove the valve when finished.

2.After discharging the unit completely, remove the desired component, and unbraze the pinch-off tubes.

3.Solder service valves into the pinch-off tube ports, leaving the valves open.

4.Solder the pinch-off tubes with Service valves.

5.Evacuate as follows.

1)Connect the vacuum pump, as illustrated Fig. 17A.

2)Start the vacuum pump, slowly open manifold valves A and B with two full turns counterclockwise and leave the valves closed. The vacuum pump is now pulling through valves A and B up to valve C by means of the manifold and entire system.

CAUTION

If high vacuum equipment is used, just crack valves A and B for a few minutes, then open slowly with the two full turns counterclockwise. This will keep oil from foaming and being drawn into the vacuum pump.

3)Operate the vacuum pump for 20 to 30 minutes, until 600 microns of vacuum is obtained. Close valves A and B, and observe vacuum gauge for a few minutes. A rise in pressure would indicate a possible leak or moisture remaining in the system. With valves A and B closed, stop the vacuum pump.

4)Remove the hose from the vacuum pump and place it on the charging cylinder. See Fig. 17B. Open valve C.

Discharge the line at the manifold connection.

5)The system is now ready for final charging.

6.Recharge as follows :

1)Refrigeration cycle systems are charged from the High-side. If the total charge cannot be put

in the High-side, the balance will be put in the suction line through the access valve which you installed as the system was opened.

2)Connect the charging cylinder as shown in Fig. 17B. With valve C open, discharge the hose at the manifold connection.

3)Open valve A and allow the proper charge to enter the system. Valve B is still closed.

4)If more charge is required, and the high-side will not

take it. Close valve A.

5)With the unit running, open valve B and add the balance of the charge.

a.Do not add the liquid refrigerant to the Low- side.

b.Watch the Low-side gauge; allow pressure to rise to 39 lbs.

c.Turn off valve B and allow pressure to drop.

d.Repeat steps B and C until the balance of the charge is in the system.

6)When satisfied the unit is operating correctly, use the pinch-off tool with the unit still running and clamp on to the pinch-off tube. Using a tube cutter, cut the pinch-off tube about 2 inches from the pinch-off tool. Use sil-fos solder and solder pinch-off tube closed. Turn off the unit, allow it to set for a while, and then test for leakage add the pinch-off connection.

— 15—

Image 15 Contents
Thru-the-Wall Series Contents Specifications Refrigerant R-410A Charge 1Ø, 230V/208V, 60Hz Btu/h 11500/11200 1Ø, 230/208V, 60Hz Btu/h 13,000/12,600 Features Control BOX Mechanical PartsFront Grille Cabinet ORIFICE, and Turbo FAN AIR Handling PartsElectrical Parts CompressorCapacitor Electronic Control Board Power CordCapillary Tube Refrigeration CycleCondenser EvaporatorPage Pulling Vacuum Piping System Outside DimensionsTroubleshooting Guide Fails to Start Complaint Cause Remedy Room AIR Conditioner Voltage Limits Complaint Cause Remedy Circuit Diagram Wiring DiagramExploded View W0CZZ CAPACITOR,FILM,BOX BRACKET,MOTOR W0CZZ CAPACITOR,FILM,BOX LocNo Description US12C10 LocNo· Description US12C30 LocNo· Description US14C30 Friedrich AIR Conditioning CO