Friedrich CP05N10A manual 0A-Pulling Vacuum

Page 11

Equipment needed: Vacuum pump, charging cylinder, manifold gauge, brazing equipment, pinch-off tool capable of making a vapor proof seal, leak detector, tubing cutter, hand tools to remove components and service valve.

 

 

COMPOUND GAUGE

 

 

 

 

MANIFOLD

 

 

 

 

 

GAUGE

 

 

 

 

 

B

A

CONDENSER

 

 

SEE INSETS

 

(HIGH PRESSURE SIDE)

 

 

 

 

 

BELOW

 

 

 

 

 

 

 

COMPRESSOR

 

 

 

 

 

 

 

EVAPORATOR

 

 

 

 

(LOW PRESSURE SIDE)

 

 

 

CAPILLARY TUBE

 

 

 

 

LO

HI

CHARGING CYLINDER

 

 

A

 

 

A

 

B

EXTERNAL VACUUM PUMP

B

 

 

 

 

 

 

C

 

 

Figure 20A-Pulling Vacuum

 

Figure 20B-Charging

 

 

—10—

 

 

 

Image 11
Contents Room Air Conditioner Service and Parts Manual Contents Preface Locations of Controls Disassembly Instructions ORIFICE, Turbo FAN and FAN AIR Handling PartsAIR Guide Upper Overload Protector Electrical PartsAIR Guide Control Board CompressorCapacitor ThermistorCondenser Power CordRefrigerant Cycle Capillary Tube Evaporator0A-Pulling Vacuum USE of Extension Cords Electrical DataCondenser Coils Piping SystemUnit is running but cooling is ineffective Troubleshooting GuideFails to Start Room AIR Conditioner Voltage Limits 203/$,17 $86 50 Complaint Cause Remedy Circuit Diagram 3/29 W0CZZ Use Factory Certified Parts