| DB9 Port Connection |
1 |
|
Using Tripp Lite cable, connect your | |
primary server’s DB9 port to the single |
DB9 port labeled “SMART” (which provides complete intelligent
2 If you have additional computers:
a.Connect them to the DB9 ports labeled “BASIC” (which provide basic,
b.Set their corresponding LAN Interface DIP Switches to the ACTIVATE (DOWN) position. See diagram for
which switch controls which port.*** | 2a. Back Panel |
DIP Switches #2 & #1
(Lan Interface Switches)
DEACTIVATE
ACTIVATE
2b. Back Panel
3 Load software and run the installation program appropriate for your operating system.
*Serial port connections are optional. Your UPS will function properly without these connections.
**The “SMART” DB9 port is always enabled and is not controlled by the LAN Interface DIP Switches.
***If you do not connect a computer to either of the “BASIC” DB9 ports, set their corresponding LAN Interface DIP Switches to the DEACTIVATE (UP) position. Note: DIP Switch #3 has no function.
Basic Operation
Switches
System Enable Switch (DIP Switch #4)
This switch is located in the set of 4 switches next to the UPS’s DB9 ports. It activates the battery charger and intelligent microproces- sor. Always leave it in the “ENABLE” (UP) position when your UPS is plugged in. Set the switch to “DISABLE” (DOWN) only if you store or ship your UPS (to reduce battery drain).
Note: the “ ” light will flash until you engage the ON/Standby Switch to activate the “ON” mode (power ON at the UPS receptacles).
4