Bryant 619CNF, 619CNQ installation instructions START-UP Checklist, Iv. Start-Up

Page 24

START-UP CHECKLIST (cont)

IV. START-UP

IF UNIT HAS A CRANKCASE HEATER, HAS IT BEEN ON FOR 24 HOURS? ____________

MEASURE AND RECORD THE:

AIR ENTERING OUTDOOR UNIT: ____________ F

AIR ENTERING INDOOR UNIT: ____________ F

DISCHARGE LINE TEMPERATURE: ____________ F

VAPOR LINE TEMPERATURE: ____________ F

MEASURE AND RECORD THE:

VAPOR LINE PRESSURE: ____________ PSIG

DISCHARGE PRESSURE: ____________ PSIG

CUT ALONG DOTTED LINE

CUT ALONG DOTTED LINE

Copyright 2006 Bryant Heating & Cooling Systems

Printed in U.S.A.

CL-2

6-06A

CATALOG NO. 02-619C0001-II

Image 24
Contents Contents Safety ConsiderationsInstallation System Matches Application RangeSystem Type Indoor Section Number Outdoor Section Number CoolingComplete PRE-INSTALLATION Checks Before InstallationPhysical Data, Under Ceiling Cooling Only Units Unpack UnitPhysical Data, Under Ceiling Heat Pump Units II. Select LocationUnit Size Weight lb UnitSize Ft-inIII. Mount Unit Installing Hex-Head Mounting Bolts Fan Coil Unit IV. Connect Refrigerant PipingConnect Condensate Drain Line Piston and Charge Combinations Cooling Only SystemsPiston and Charge Combinations Heat Pump Systems Piston and Charge Combinations Heat and Cool SystemsAccuRater Metering Device at Service Valve Mounting Hanging BracketsVI. Make Electrical Connections Electrical DataComponent Location Typical Ceiling-Suspended System VII. Install Thermostat Line Power ConnectionsASM ASRTran FPTThermostats VIII. Make Connections Between Indoor and Outdoor Units Check AccuRater Metering DeviceCooling Only Systems Heat Pump SystemsCooling System Wiring Diagram Heat Pump Wiring Diagram III. Adjusting Airflow IV. Operating Mode MemoryAutomatic Operation AUTO. Mode START-UPCleaning and Maintenance LubricationII. AIR Filters FIG III. Clean Indoor Unit Bottom Panel IV. Clean Indoor CoilClean Outdoor Coil Outdoor Unit VI. Clean Condensate DrainsTroubleshooting Problem Cause Typical SolutionService Training Call for Free CatalogSTART-UP Checklist Preliminary Information II. PRE-START-UPIII. Piping START-UP Checklist IV. START-UP