START-UP CHECKLIST (cont)
IV. START-UP
IF UNIT HAS A CRANKCASE HEATER, HAS IT BEEN ON FOR 24 HOURS? ____________
MEASURE AND RECORD THE:
AIR ENTERING OUTDOOR UNIT: ____________ F
AIR ENTERING INDOOR UNIT: ____________ F
DISCHARGE LINE TEMPERATURE: ____________ F
VAPOR LINE TEMPERATURE: ____________ F
MEASURE AND RECORD THE:
VAPOR LINE PRESSURE: ____________ PSIG
DISCHARGE PRESSURE: ____________ PSIG
CUT ALONG DOTTED LINE
CUT ALONG DOTTED LINE
Copyright 2006 Bryant Heating & Cooling Systems | Printed in U.S.A. | CATALOG NO. |