Bryant 619CNQ, 619CNF Mounting Hanging Brackets, AccuRater Metering Device at Service Valve

Page 9

a40-625

Fig. 10 — Mounting Hanging Brackets

MOUNTING

SLOT

 

 

a40-531

 

HEX-HEAD

NOTE: Teflon Seal must face toward the outdoor heat pump unit.

a40-933

Fig. 13 — AccuRater Metering Device at Service Valve

BOLT

 

(Bypass Type Components),

Fig. 11 — Hanging Fan Coil Unit

 

 

Heat Pump Systems Only

a40-940

*Factory-supplied.

Fig. 12 — Routing Wires Over Piping

—9—

Image 9
Contents Contents Safety ConsiderationsInstallation Application Range System MatchesSystem Type Indoor Section Number Outdoor Section Number CoolingBefore Installation Complete PRE-INSTALLATION ChecksPhysical Data, Under Ceiling Cooling Only Units Unpack UnitPhysical Data, Under Ceiling Heat Pump Units II. Select LocationUnit Size Unit Weight lbSize Ft-inIII. Mount Unit IV. Connect Refrigerant Piping Installing Hex-Head Mounting Bolts Fan Coil UnitPiston and Charge Combinations Cooling Only Systems Connect Condensate Drain LinePiston and Charge Combinations Heat Pump Systems Piston and Charge Combinations Heat and Cool SystemsMounting Hanging Brackets AccuRater Metering Device at Service ValveElectrical Data VI. Make Electrical ConnectionsComponent Location Typical Ceiling-Suspended System Line Power Connections VII. Install ThermostatASR ASMTran FPTThermostats Check AccuRater Metering Device VIII. Make Connections Between Indoor and Outdoor UnitsCooling Only Systems Heat Pump SystemsCooling System Wiring Diagram Heat Pump Wiring Diagram IV. Operating Mode Memory III. Adjusting AirflowAutomatic Operation AUTO. Mode START-UPCleaning and Maintenance LubricationII. AIR Filters FIG IV. Clean Indoor Coil III. Clean Indoor Unit Bottom PanelClean Outdoor Coil Outdoor Unit VI. Clean Condensate DrainsProblem Cause Typical Solution TroubleshootingCall for Free Catalog Service TrainingSTART-UP Checklist Preliminary Information II. PRE-START-UPIII. Piping IV. START-UP START-UP Checklist