Outback Power Systems GVFX, GTFX manual Grid-INTERACTIVE FX Series Inverter/Charger Programming

Page 6

Grid-INTERACTIVE FX Series Inverter/Charger Programming

Note: Please see the FX and VFX Series Inverter/Charger Installation Manual to install, wire, and connect each FX Series Inverter/Charger. This programming manual assumes all FXs have been installed and are ready to program according to the way they were wired. To familiarize yourself with the programming concepts, please read through the entire manual before programming your system.

Up to two grid-interactive FXs can be combined and wired or “stacked.”

Stacking FXs does not refer to physically placing one FX on top of another, but to how they are wired within the system and then programmed for operation. Stacking allows all the FXs to work together as a single system.

Stacking assigns the FXs to power individual legs of the system and to operate at certain times; this order is assigned using the MATE.

NOTE: An OutBack MATE with a code revision of 3.30 or higher is required to recognize and program Grid-Interactive FXs. When multiple FXs are used, each needs to be assigned a status—Master or Slave (at least one FX must be a Master).

The Master FX is the primary and most heavily used unit. The loads and demands of the system determine when and which Slaves are used. A Slave FX assists when the load demands are more than the Master FX can handle alone.

This is an orderly process as long as the user assigns each FX correctly. This is mainly a matter of paying attention to the Port number for each FX when programming with the MATE.

Stacking Concerns

FXs should be wired and stacked appropriately to their individual power system. Problems can occur when:

An FX is incorrectly wired.

An FX plugged into a HUB Port is mistakenly programmed (assigned the wrong status) or misidentified.

An easy rule to remember is any FX wired to a specific phase or leg must be programmed to that phase.

Stacking Options

The Grid-Interactive FX Series Inverter/Chargers can be stacked in Classic Series only, which is limited to two grid-interactive FXs.

A HUB-4 or HUB-10 must be included to stack grid-interactive FXs. The Grid-Interactive FX cannot do time-of-day selling.

If the utility grid fails, the GTFX or GVFX seamlessly transfers the loads to the battery bank. When the utility grid reappears, the Grid-Interactive FX automatically recharges the battery bank in case of future power outages.

Note: The FW-X240 Auto Transformer cannot be used for stacking with a Grid-Interactive FX system. The FW-X240 can be used to step-up the AC output of a single Grid-Interactive FX system, however.

5

Image 6
Contents Grid-Interactive Disclaimer Warranty SummaryAbout Outback Power Systems Contact InformationTable of Contents Condition Voltage Range VAC Frequency Hz Seconds Allowed Important Safety Instructions Grid-INTERACTIVE FX Series Inverter/Charger Programming Stacking ConcernsStacking Options Components and Connections LED Color LED Action LED Indicates Mate Screens Stacking and Assigning FX Status Stacking OptionsClassic Stacking MasterProgramming the FXs 141ADV Down INC DEC Master Classic SlavePower Save Levels AC on Turn the AC input breakers on Auxiliary AUX Functions ADV/PASSWORD P00 Adjustable AUX Output Functions List of AUX FunctionsP00 ADV/FX/AUX Battery Charging Instructions MaintenanceBattery Charging Setpoints FX Default Values subject to change with FX upgrades GenAlert Off Set Point On Set PointWarranty OutBack Power Systems Two Year Limited WarrantyExtended Warranty Application U.S. and Canada only Product RegistrationYear Limited Warranty California GTFX, Gvfx and PS1 ProductsRevision.2007-06-01 System Owner Year Warranty Registration CaliforniaInstaller Product