Grizzly G0561 Wheels & Leveling Feet, Chip Screen, To install the wheels and leveling feet

Page 19

Wheels & Leveling

Feet

The wheels may be installed to make it easier to move the G0561 bandsaw.

Components and Hardware Needed:

Qty

Wheels

2

Axle

1

Cotter Pins 3 x 30mm

2

Leveling Feet with Hex Nuts

2

Flat Washers 10mm

2

To install the wheels and leveling feet:

 

1.Slide the axle through the holes in the bottom of the cabinet.

2.Slide the wheels on the axle and secure with the two cotter pins as shown in Figure 7.

Axle

Figure 7. Wheels installed.

3.Screw the threaded portion of the leveling feet, followed by the flat washer and hex nut, into the base of the cabinet as shown in

Figure 8.

4.Adjust the feet to level the bandsaw as need- ed.

Hex Nut & Flat Washer

Leveling Feet

 

Figure 8. Leveling feet installed.

Chip Screen

The chip screen is designed to prevent chips and cut-offs from entering the coolant tank.

Components and Hardware Needed:

Qty

Chip Screen

1

To install the chip screen:

1.Place the chip screen into the opening shown in Figure 9.

Chip Screen

Figure 9. Chip screen installed.

G0561 7" x 12" Metal-Cutting Bandsaw

-17-

Image 19 Contents
Model G0561 METAL-CUTTING Bandsaw Page Table of Contents Service Accessories MaintenanceWarranty and Returns Foreword IntroductionContact Info Machine Data Sheet Table Info Identification Safety Instructions for Machinery SafetyAlways Lock Mobile Bases if Used Before Operating Machinery Safety Instructions for Metal Cutting Bandsaws Circuit Requirements Wiring for110/220V Operation Grounding Extension Cords Unpacking SetupSetup Safety Items Needed for Setup Inventory Box Contents Figure Qty Hardware Bag Hardware Recognition Chart Site Considerations CleanupTo remove the shipping bracket To install the work stopShipping Bracket Work StopChip Screen To install the wheels and leveling feetTo install the chip screen Wheels & Leveling FeetPulley Cover To install the pulley coverTo tension or change the V-belt position To install the handleBelt HandleTo assemble the bandsaw for vertical cut- ting Vertical AssemblyTest Run Recommended AdjustmentsAdjustments Factory adjustments that should be verifiedOperations Operation Safety ViseTo square the blade to the vise Blade Speed To adjust the angle on the viseTo change blade speeds E C T R O C U T I O N Blade SelectionBlade Guides Cutting Fluid SystemBiological Poison Hazard Cutting FluidTo set the feed rate Feed RateTips for horizontal cutting Operation TipsTips for vertical cutting H5405-LenoxLube Tube AccessoriesG7897-Machining Fluid H1302 H4979 H4977 H1302-Standard EarmuffsH1300 H1298 G7984 H2347 H0736 Lubrication MaintenanceCleaning ScheduleTroubleshooting ServiceBandsaw Operations To change the blade on the bandsaw Blade ChangeBlade Tension Tracking To adjust the blade tracking on the bandsawTo square the blade to the bed of the table Squaring the BladeBlade Guide Bearings To adjust the blade guide bearingsCircuit breaker and capacitor Electrical ComponentsG0561 110V & 220V Wiring Diagram G0561 Cabinet/Base G0561 Bow/Motor G0561 Gear Box Description Parts ListGear BOX Assembly Motor Mount Plate Safety Label Placement Machine Labels & Parts ListWarranty and Returns Comments Warranty CardBOX BELLINGHAM, WA Grizzly INDUSTRIAL, INCPage Call Today For a Free Full Color Catalog