Global Machinery Company 040521 ED8 PR instruction manual Required tools, Unpacking

Page 7

Required tools

No tools are required to assemble this tool. 2 face spanners (supplied) are required to change the blade.

Unpacking

Due to modern mass production techniques, it is unlikely that your GMC Power Tool is faulty or that a part is missing. If you find anything wrong, do not operate the tool until the parts have been replaced or the fault has been rectified. Failure to do so could result in serious personal injury.

1.Remove all loose parts from the carton.

2.Remove the packing materials from around the saw.

3.Carefully lift the saw from the carton and place it on a level work surface.

7

Image 7
Contents Tile Cutting Saw Contents Specifications SymbolsGeneral safety instructions Safety rules for laser lightsAdditional safety rules for tile cutting saws Position of tile saw AccessoriesUnpacking Required toolsKnow your product Bevel lock Attaching the laser light assemblyMitre gauge Rip fenceBlade guard Installing a bladeTurning on and off Always fill the water Filling the water compartmentMaking a straight cut Making a mitre cut OperationAdjusting the Redeye laser line generator Using the Redeye laser line generator systemGeneral inspection MaintenanceCleaning Changing the batteriesPage Save this Manual for future reference