6.0Setup and assembly
Open shipping cartons and check that all parts are intact. Report any damage immediately to your distributor. Read the instruction manual thoroughly for assembly, alignment, and maintenance instructions.
6.1Tools required
1#3 cross point screwdriver
17/16” wrench
11/2" wrench
1Combination square & straight edge
11/4” hex key
13/16” hex key
6.2Shipping contents
1XACTA Fence II
1Front rail
1Back rail
1Guide tube
3Black plastic end covers
1Owner’s manual
1Warranty registration card
1Hardware package (p/n
7 Flat head screws, 1/4 x
2 Hex cap screws, 5/16 x 3/4
24 Flat washers, 1/4
19 Lock washers 1/4
12 Hex nuts 1/4
*Hardware package is shipped inside guide tube. Contents are shown full scale in Figure 1.
6.3Front rail installation
1.Identify the front rail (A, Figure 2), which is
2.Lightly secure front rail (A) to table with seven 1/4 x
Figure 1
Figure 2
7