Echo PAS-225SB specifications Starting Cold Engine, Purge Bulb

Page 19

PAS-225SB

OPERATION

 

 

Starting Cold Engine

The attachment will operate immediately when the engine starts, and could result in possible serious injury. Keep movable parts of the attachment away from objects that could become entangled or thrown, and surfaces that could cause loss of control.

1.Stop Switch

Move stop switch button (A) forward, away from the STOP position.

A

2.Choke

Move choke lever (B) to Cold Start Position ( ).

3.Purge Bulb

Pump purge bulb (C) until fuel is visible and flows freely in the clear fuel tank return line. Pump bulb an additional 4 or 5 times.

4.Recoil Starter

Lay the unit on a flat area and keep movable attachment parts clear of all obstacles. Firmly grasp throttle handle and throttle trigger lockout with left hand and fully depress throttle trigger to wide open position. Rapidly pull recoil starter handle/rope

(D) until engine fires (or maximum five [5] pulls).

5.Choke

After engine fires (or 5 pulls), move choke (B) to the Run

( ) (open) position. Firmly grasp throttle handle and throttle trigger lockout with left hand and fully depress throttle trigger to wide open position. Pull starter handle/rope until engine starts and runs. Release throttle trigger and allow unit to warm up at idle for several minutes.

Note: If engine does not start with choke in “Run” position after 5 pulls, repeat instructions 2 - 5.

6.Throttle Trigger

B

C

D

After engine warm-up, grip throttle handle and support handle. Depress the throttle trigger lockout, and gradually depress throttle trigger to increase engine RPM to operating speed.

X7722277602

19

© 02/2014 ECHO Inc.

Image 19
Contents Burn Hazard Operator’s ManualTable of Contents Servicing Information IntroductionAdditional or Replacement Manuals SafetyManual Safety Symbols and Important Information PAS-225SB International SymbolsPersonal Condition and Safety Equipment Repetitive Stress Injuries Vibration and ColdEquipment EPA 2010 and Later and/or C.A.R.B. Tier Emission Control Exhaust & EvaporativeProduct Emission Durability Emission Compliance Period Description Description Contents Power Head Shaft/Lower Shaft Assembly AssemblyPlastic Shield Installation To Advance Trimmer Line Nylon Line Head InstallationRemove Nylon Line Head Fuel Requirements Support Handle InstallationOperation FuelAfter use Handling FuelBlade Selection Operation With BladesOperation Purge Bulb Starting Cold EngineStopping Engine Starting Warm EngineMaintenance Intervals MaintenanceSkill Levels Fuel Filter Air FilterCooling System Spark PlugSpark Arrestor Screen Exhaust SystemHigh Altitude Operation Carburetor AdjustmentExhaust Port Cleaning Engine Break-InLubrication Gear HousingDrive Shaft lower Drive Shaft Upper Nylon Line Head Disassembly InstructionsTrimmer head is now fully loaded and ready for operation Nylon Line ReplacementSharpening Metal Blades Engine Problem Troubleshooting Chart TroubleshootingStorage Storage Hook InstallationLong Term Storage Over 30 Days Model SpecificationsRecommended Optional Attachments Echo Approved Optional AttachmentsOWNER’S Responsibility Warranty StatementWarranty Statement ECHO, Incorporated