9. To prevent accidents, turn off the Saw, remove the Key, and unplug the Tile Saw after use. Clean, then store the Saw indoors out of children’s reach.
General Operating Instructions
1. Fill the Water Tray with clean water up to the Fill Rim (see Figure H on page 11) before every use.
CAUTION: Water level must be kept above lip of pump basin at all times during operation.
2. Adjust the Miter, Bevel, and Depth settings as needed, see previous page. Lock all settings in place.
3. Place the workpiece on the Table and firmly against the Miter Gauge and Fence.
4. Make sure the workpiece is clear of the Blade, then dry your hands, plug in the Saw, insert the Key and turn the Power Switch to the ON position.
5. Make sure the pump is supplying enough water to the Blade. If needed, dry your hands, unplug the Saw, adjust the Pump′s flow control, dry your hands again, and plug the Saw back in.
6. Let the Blade build up to full speed before cutting.
7. Hold the material firmly against the rip guide and feed the material into the Blade.
8. When the cut is made, turn the Saw OFF. Wait for the Blade to come to a complete stop before removing any part of the workpiece.

SAFETY

SETUP

OPERATION

MAINTENANCE

Page 14

Figure N: Straight Cut

Figure O: Miter Cut

Figure P: Bevel Cut

 

For technical questions, please call 1-800-444-3353.

Item 69275

Image 14
Contents Industrial TILE/BRICK SAW Save this ManualTable of Contents Setup Operation Maintenance General Tool Safety WarningsSafety Grounding Pin 110-120 V~ Grounded Tools Tools with Three Prong PlugsGrounding Instructions Tile Saw Safety Warnings Tile Saw Power Cord Drip Loop Extension Safety Setup OperationPower Cord Drip Loop Position of Tile SAWAdditional Tile SAW Safety Warnings Vibration Safety SpecificationsSetup Before Use FunctionsOperation Maintenance Installing the Water Tray Frame to the Leg StandInstalling Motor Head and Water Tray Frame To Prevent Serious Injury from Accidental OperationSetup Operation Installing the Particle TrayWater Tray and Pump Setup Inner Outer Flange Flange Spindle Nut Blade Installing BladeOperating Instructions Depth Adjustment Miter AdjustmentBevel Adjustment Work Piece and Work Area Set UpFigure N Straight Cut To Prevent Serious Injury from Tool Failure Cleaning, Maintenance, and LubricationMaintenance and Servicing Troubleshooting Problem Possible Causes Likely SolutionsMain Parts List parts Parts Lists and DiagramStand Parts List 10a 11a 12a For technical questions, please call Assembly Diagram1a 2a 2a 4a 5a 6a 3a 7a Limited 90 Day Warranty Mission Oaks Blvd. PO Box 6009 Camarillo, CA 93011 800