Turning on the Expansion Enclosure
Turn on the SC100/SC120 expansion enclosure after racking and cabling all of the Storage Center components.
Turn on the expansion enclosure by pressing both power switches at the same time.
Figure 6. Location of the SC100/SC120 Expansion Enclosure Power Switches
The status indicator on the front of the expansion enclosure turns blue when the expansion enclosure is powered up and operational.
NOM Information (Mexico Only)
The following information is provided on the device described in this document in compliance with the requirements of the official Mexican standards (NOM):
Importer: | Dell Inc. de México, S.A. de C.V |
| |
| Paseo de la Reforma |
| Col. Lomas Atlas |
| 11950 México, D.F. |
Model number: | E03J and E04J |
Supply voltage: | |
Frequency: | 50/60 Hz |
Current consumption: |
Technical Specifications
The technical specifications of the SC100/SC120 expansion enclosures are displayed in the following tables.
Drives
SAS hard drives | SC100: Up to 12 |
| SC120: Up to 24 |
7