Chicago Electric 45690 To Use The Power Switch, To Use The Operating Lever, Assy. Diagram

Page 9

 

OPERATING

REAR HEX JAM

LEVER (#5)

CAP SCREW

NUT (#10)

FRONT HEXT JAM

(#3)

 

NUT (#10)

 

UPPER TONG

(#46)

 

HEX NUT (#20)

TONG

 

TIP

 

(#48)

FIGURE F

LOWER TONG (#47)

To Use The Power Switch:

1.The Power Switch (part #25) allows electrical current to the Spot Welder to be turned “ON” and “OFF”. (See Figure D, and Assy. Diagram.)

2.Turn the Power Switch (part #25) sideways in either direction to start the electrical current. Release the Power Switch to stop the electrical current.

To Use The Operating Lever:

1.Caution: Never touch the Upper and Lower Tongs (parts #46, #47) when welding a workpiece. Allow the Tong Tips (part #48) and the workpiece to cool before handling. (See Figures A, B, E, and Assy. Diagram.)

2.The Operating Lever (part #5) allows you to open and close the Upper and Lower Tongs (parts #46, #47). (See Figures A, F, and Assy. Diagram.)

3.Close the Operating Lever (part #5) during the welding process to compress the workpieces between the Tong Tips (part #48). Open the Operating Lever after the spark appears and each weld is made to release the workpieces. (See Figures B,

A, F, and Assy. Diagram.)

SKU 45690

PAGE 9

Image 9
Contents Spot welder Specifications Table General Safety Warnings and PrecautionsSave this Manual Specific Product Warnings and Precautions See Figures A, B, E, and Assy. Diagram Diagram Assembly InstructionsUnpacking To Attach The Upper And Lower TongsTo Attach The Handle To The Spot Welder See Figure C, and Assy. DiagramTo Attach Tong Tips To The Spot Welder See Figure D, and Assy. DiagramTo Adjust The Tong And Operating Lever Pressure See Figures A, and Assy. DiagramOperating Instructions To Use The Power Switch Assy. DiagramTo Use The Operating Lever Page Please Read the Following Carefully Description Qty Parts ListAssembly Diagram Limited 1 Year / 90 day warranty