Carrier 38VYX130, 38VYX110 Minimum clearances, Obstacle at rear side, Upper side is free

Page 7

38VYX110/38VYX130

Minimum clearances

Obstacle at rear side

Upper side is free

Single unit installation

150 or more

Obstacles at both right and left sides.

200

more

 

or

150

 

 

 

300

or more

 

 

 

or more

 

 

 

 

 

 

 

 

 

 

The height of the obstacle should be lower than the height of the outdoor unit.

Serial installation of two or more units

 

 

 

 

 

 

 

 

 

 

 

 

 

 

200ormore

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

300

 

 

300

 

 

 

 

 

150

 

 

 

 

300

 

• The height of the obstacle should be lower than the height of the outdoor unit.

or more

or more

or more

 

or more

 

Obstacle at rear side

Obstacle also at the upper side

500

more

150

or more

 

 

or

 

 

Obstacle at front side

 

Upper side is free

Single unit installation

Obstacles at both right and left sides.

500 ormore

1000 ormore

Obstacle at front side

Obstacle also at the upper side

1000

1000

moreor

 

 

or more

 

 

GB - 6

Image 7 Contents
38VYX110/38VYX130 38VYX110/38VYX130 Heat pump split system outdoor units Contents R410A Special requirement Precautions for safety Required tools for installation work General informationSelection of installation Accessory and refrigerantCover knockout for pipe connection Knockout procedure Installation PlaceHow to remove the front panel Outer dia. of copper pipe R410A R22 Refrigerant pipingFlaring Table V Pipe outer diameterObstacle also at the upper side Minimum clearancesObstacle at rear side Upper side is free38 VYX InstallationStandard installation Obstacles at both front and rear sidesTable VII Piping connection Table VI Optional Installation PartsTable Viii Air Purge Close Open EvacuatingVacuum pump 38VYX110 38VYX130Make refrigerant connections before electrical connections Valve handling precautionsPower cable and connecting cable Electrical connectionsLED indication and code checking Final installation checksCheck and Test Operation Useful FunctionsNew tools for R410A Applicable to R22 model Changes Installation/Servicing ToolsTable New tools for R410A Changes in the product and componentsVia R. Sanzio, 9 20058 Villasanta MI Italy Tel /3636.1 38VYX