Grizzly G1028Z/G1029Z owner manual Upper collection bag secured

Page 17

5.Secure the front lower support bracket to the collector with (2) 516"-18 x 12" flange bolts.

6.Place the upper support bracket over the lower support bracket, and secure with (2) 516"-18 x 12" flange bolts, as shown in Figure 9.

Note: The collector attaches to each sup- port bracket. The inside of the collector is funnel shaped and directs the air around in a cyclone motion. Make sure that the inside taper (funnel) is faced downward and the col- lector inlet faces toward the collector body.

Upper Support Bracket

Lower

Support

Bracket

Collector

Figure 9. Mounting collector to brackets.

7.Slip a loosened hose clamp over each end of the flex-hose, and attach the ends over the collector and collector body outlet. Tighten each hose clamp until snug, as shown in

Figure 10.

Flex Hose

Hose Clamp

Figure 10. Attaching flex hose onto collector

body outlet.

G1028Z/G1029Z Dust Collector

8.Hook the top loop of the upper filter bag (fabric) over the support bracket, as shown in

Figure 11.

Figure 11. Attaching upper filter bag.

9.Tighten the upper bag to the collector using the clamp shown in Figure 12.

Clamp

Figure 12. Upper collection bag secured.

-15-

Image 17
Contents Dust Collector Page Table of Contents Contact Info IntroductionForeword Machine Data Sheet G1028Z/G1029Z Dust Collector Machine Data Sheet G1028Z/G1029Z Dust Collector Safety Instructions for Machinery G1028Z/G1029Z Dust Collector Additional Safety for Dust Collectors G1028Z 110/220V Operation Circuit Requirements15 plug and receptacle G1029Z 220V OperationSetup Safety Unpacking SetupItems Needed for Setup InventoryPlacement Location Clean UpSite Considerations Floor LoadTo assemble your machine AssemblyUpper collection bag secured To test run the machine Test RunMetal Duct Designing SystemGeneral Duct Material Plastic Duct Flexible DuctDecide Who Will Design System DesignSketch Your Shop Layout Sketch a Basic Duct LayoutApproximate Determine Required CFM of Each MachineMachine Total CFM Branch Line Size Determining Main Line Duct SizeDetermining Branch Line Duct Size Duct Approximate Dia Calculating Duct ResistanceLoss Per Foot Fitting 90˚ 45˚ Dia Elbow WyeYSystem Grounding Flex-hose grounded to machine General Operation SafetyOperations Half-mask respirator with disposable Cartridge filters AccessoriesMetal Elbows Metal BranchesReducers & Adapters Bag Cleaning MaintenanceSchedule LubricationTroubleshooting ServiceDust Collector Operation Switch G1028Z Wiring DiagramG1029Z Wiring Diagram G1028Z/G1029Z Parts Breakdown G1029Z Parts List G1028Z Parts ListPage Page Warranty and Returns