Powermatic PJ1696 Receiving the Jointer, Installation and Assembly, Fence Installation

Page 9

Receiving the Jointer

Carefully unpack the jointer and all loose items from the wood crate and inspect for damage. Any damage should be reported to your distributor and shipping agent immediately. Before proceeding further, read your manual thoroughly to familiarize yourself with proper assembly, set-up, maintenance, safety and operating procedures.

Exposed metal parts such as the table and fence have been given a protective coating at the factory. This should be removed with a soft cloth moistened with a solvent (such as kerosene). Do not use acetone, gasoline or lacquer thinner for this purpose. Do not use an abrasive pad. After cleaning, it is recommended that you cover all unpainted surfaces with a good quality paste wax.

Crate contents:

1 jointer

1 dust chute

1 fence assembly

4 hex wrenches (3, 5, 8 and 10mm)

3open-end wrenches (10-12mm, 12-14mm,

17-19mm)

2push pads

1helical cutter head tool package: 2 rabbet knives

8 two-sided standard knives

7 gibs

7 gib nuts

7 gib screws

1 hex wrench 5mm (L type)

3 hex wrenches 5mm (T type)

1manual

1warranty card

Installation and Assembly

Tools required

10mm hex wrench (provided) Phillips screwdriver

The supplied tools are shipped inside the bottom of the stand, and can be removed through the dust outlet (A, Figure 5) on the left side of the machine.

Remove the bolts holding the jointer to the skid, and lift the machine from the skid using a hoist. The strap should be suitable to lift 1320 pounds of weight, and should be placed under the base casting as shown in Figure 6. DO NOT place strap under the tables.

Figure 5

Figure 6

The jointer should be mounted to a solid, level foundation, preferably a concrete floor. The machine area should be clean, dry, well ventilated and well lighted, with sufficient space around the machine for operation and maintenance work.

This machine is equipped with noise-reducing table lips. The work site should, however, be one which minimizes reverberant sound from walls, ceilings and other equipment.

Fence Installation

Mount the fence (A, Figure 7) to the holes on the jointer table with the two socket head cap screws (B, Figure 7), using a 10mm hex wrench. Tighten the screws (B, Figure 7) securely.

9

Image 9
Contents Inch Jointer Warranty Period Warranty and ServiceTable of Contents Page Page Safety Label Features PJ1696 Jointer Introduction Specifications Installation and Assembly Fence InstallationReceiving the Jointer Start/Stop Switch Dust HoodElectrical Connection Setting Outfeed Table AdjustmentsDrive Belt Replacing Knife InsertsTable Raising Limit Blocks Infeed Table AdjustmentHand Placement Fence AdjustmentsOperating Instruction Edge JointingJointing Warped Surfaces RabbetingJointing Short or Thin Work Direction of GrainBeveling MaintenanceTaper Cuts LubricationBlade Inserts Replacement Parts TroubleshootingIndex No. Part No Description Size Qty Parts List Cutterhead Assembly PJ1696 JointerCutterhead Assembly PJ1696 Jointer Parts List Fence Assembly PJ1696 Jointer Fence Assembly PJ1696 Jointer Parts List Stand Assembly PJ1696 Jointer Stand Assembly PJ1696 Jointer Parts List Bed Assembly PJ1696 Jointer Bed Assembly PJ1696 Jointer Parts List Cutterhead Guard Assembly PJ1696 Jointer Cutterhead Guard Assembly PJ1696 Jointer Parts List Infeed Table Assembly PJ1696 Jointer Infeed Table Assembly PJ1696 Jointer Parts List Outfeed Table Assembly PJ1696 Jointer Outfeed Table Assembly PJ1696 Jointer Parts List Motor Assembly PJ1696 Jointer Electrical Connections Preventive Maintenance Page New Sanford Road LaVergne, Tennessee
Related manuals
Manual 4 pages 20.56 Kb