Liebert SL-14050 installation and operation guide Installation Operation Guide

Page 1

SGH Steam

Generating Humidifier

Installation and

Operation Guide

IMPORTANT: Read and save this guide for future reference. This guide to be left with equipment owner.

SL-14050

Form # 99-428 Rev. 1 / 150-1633 Rev. A

Image 1
Contents Installation Operation Guide Table Of Contents Basic Humidifier Configuration PRE-INSTALLATION CheckpointReceiving & Unpacking Equipment Location & MountingSee Figure #6 for mounting clearances Blower PacksSteam Distributors Front SideFigure #7 Steam Distributor Location Water Supply Line PlumbingSteam Line Drain LineFigure #19 Long Steam Lines Condensate Return Line Accessories Fill CUP Extension KitsLOW Voltage Control Wiring Primary Voltage Supply Wiring to HumidifierElectrical On-Off ControlsOptional Modulation Continuous Control InstallationControls see Figure #28 Introduction Manual Capacity AdjustmentSGH Operation Optional Modulation Continuous Control Packages by LiebertDetecting Water Supply Deficiency Other PotentiometersRemote Indication Double Unit OperationLimited Warranty Cylinder Last Replaced