Liebert SL-14050 Receiving & Unpacking Equipment, PRE-INSTALLATION Checkpoint, Humidifiers

Page 3

INSTALLATION

RECEIVING & UNPACKING EQUIPMENT

1.Check packing slip to ensure ALL material has been delivered.

2.All material shortages are to be reported to Liebert within 48 hours from receipt of goods. Liebert assumes no responsibility for any material shortages beyond this period.

3.Inspect shipping boxes for damage and note on shipping waybill accordingly.

4.After unpacking, inspect equipment for damage and if damage is found, notify the shipper promptly.

5.All Liebert products are shipped on an F.O.B. factory basis. Any and all damage, breakage or loss claims are to be made directly to the shipping company.

PRE-INSTALLATION CHECKPOINT

1.Ensure that available voltage and phase corresponds with humidifier voltage and phase as indicated on humidifier’s nameplate label (see Figure #1).

Figure #1

SGH Series Humidifier

Condensate Steam

Return Outlet

 

 

Power And

 

 

Control

Drain

Nameplate

Wiring

 

Label

 

 

Water

 

 

Supply

 

2.Ensure that the dedicated external disconnect is of sufficient size to handle the rated amps as indicated on the nameplate label. Refer to local codes.

3. Report any discrepancy immediately.

BASIC HUMIDIFIER CONFIGURATION

Liebert humidifier model SGH has a right side electrical compartment. Each electrical compartment has a hinge-down front door which is removable from any partially or fully opened position. Each electrical compartment has a screw-mounted right side cover which can also be removed for ease of electrical connection. For safety, the door when closed keeps the side cover from being removed.

Single units have a plumbing compartment attached to the left side of the electrical. Double units have a second plumbing compartment. Each plumbing compartment has a hinge-down front door which is not intended to be removed. For safety, the door must be closed in order to engage the lock. To avoid any danger, never operate the humidifier with a door off. For safety, each door when closed engages its own safety interlock switch. All switches must be engaged before the unit will operate.

To open the doors, unlock key, lift door up slightly and pull top of door forward. Door will hinge 180 degrees and hang straight down. To remove door, swing door parallel to floor. Then lift up slightly and out. To reinstall door, hold parallel to floor and insert hinge pins at bottom. The door can then be closed.

Figure #2

Clearance Requirements

WALL

WITHOUT BLOWER PACK

TOP VIEW

MIN. 36" SIDE

CLEARANCE

RECOMMENDED.

SEE NOTE.

NOTE: LOCAL AND NATIONAL

 

 

 

 

CODES MAY DEVIATE. PLEASE

MIN. 36"

 

 

 

CONSULT APPLICABLE CODES

FRONTAL

FOR CLEARANCE REQUIREMENTS

CLEARANCE.

IN ALL CASES.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LOCATION & MOUNTING

HUMIDIFIERS

SGH humidifiers are designed to mount on a suitable wall or vertical surface. Do not sit on floor due

- 1 -

Image 3
Contents Installation Operation Guide Table Of Contents Location & Mounting PRE-INSTALLATION CheckpointBasic Humidifier Configuration Receiving & Unpacking EquipmentSee Figure #6 for mounting clearances Blower PacksSteam Distributors Front SideFigure #7 Steam Distributor Location Water Supply Line PlumbingSteam Line Drain LineFigure #19 Long Steam Lines Condensate Return Line Accessories Fill CUP Extension KitsOn-Off Controls Primary Voltage Supply Wiring to HumidifierLOW Voltage Control Wiring ElectricalControl Installation Optional Modulation ContinuousControls see Figure #28 Optional Modulation Continuous Control Packages by Liebert Manual Capacity AdjustmentIntroduction SGH OperationDouble Unit Operation Other PotentiometersDetecting Water Supply Deficiency Remote IndicationLimited Warranty Cylinder Last Replaced