286B / 289B
OUTDOOR WALL | INDOOR WALL |
CAULK | LIQUID TUBE |
| |
INSULATION | SUCTION TUBE |
|
THROUGH THE WALL
JOIST
HANGER STRAP
(AROUND SUCTION
TUBE ONLY) INSULATION
SUCTION TUBE
1” (25.4 mm) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
MIN |
|
|
|
|
|
|
| LIQUID TUBE |
|
|
|
|
|
|
| ||
| SUSPENSION |
A07588
Fig. 1 - Connecting Tubing Installation
Specifications for this unit in residential new construction market require the outdoor unit, indoor unit, refrigerant tubing sets, metering device, and filter drier listed in presale literature. There can be no deviation. Consult the Service Manual – Air Conditioners and Heat Pumps Using Puron® Refrigerant to obtain required unit changes for specific applications and for
Check Equipment and Job Site
Unpack Unit
Move to final location. Remove carton taking care not to damage unit.
Inspect Equipment
File claim with shipping company prior to installation if shipment is damaged or incomplete. Locate unit rating plate on unit corner panel. It contains information needed to properly install unit. Check rating plate to be sure unit matches job specifications.
Install on a Solid, Level Mounting Pad
If conditions or local codes require the unit be attached to pad, tie down bolts should be used and fastened through knockouts provided in unit base pan. Refer to unit mounting pattern in Fig. 2 to determine base pan size and knockout hole location.
For hurricane tie downs, contact distributor for details and PE (Professional Engineer)Certification, if required.
On rooftop applications, mount on level platform or frame. Place unit above a
Roof mounted units exposed to winds above 5 mph may require wind baffles. Consult the Service Manual - Residential Split System Air Conditioners and Heat Pumps Using Puron® Refrigerant for wind baffle construction.
NOTE: Unit must be level to within ±2° (±3/8 in./ft,±9.5 mm/m.)per compressor manufacturer specifications.
Clearance Requirements
When installing, allow sufficient space for airflow clearance, wiring, refrigerant piping, and service. Allow 24 in. (609.6 mm) clearance to service end of unit and 48 in. (1219.2 mm) (above unit. For proper airflow, a
On rooftop applications, locate unit at least 6 in. (152.4 mm) above roof surface.
View From Top |
UNIT BASE PAN | TIEDOWN KNOCKOUT LOCATIONS in. (mm) | |||
Dimension in. (mm) | A | B | C | |
35 X 35 | ||||
(889 X 889) | ||||
|
|
| ||
|
|
| A05177 |
Fig. 2 - Tiedown Knockout Locations
Operating Ambient
The minimum outdoor operating ambient in cooling mode is 55_F (12.78_C) without low ambient cooling enabled, and the maximum outdoor operating ambient in cooling mode is 125_F (51.67_C). At line voltage of 208v (or below) and an outdoor ambient of 120_F (48.9_C) (and above), the compressor operates in low stage. On Evolution communicating systems ONLY, low ambient cooling operation is possible at ambient as low as 0_F
The maximum outdoor operating ambient in heating mode is 66°F/18.89_C on all models.
Elevate Unit
!CAUTION
UNIT OPERATION HAZARD
Failure to follow this caution may result in equipment damage or improper operation.
Do not allow water and/or ice to build up in base pan.
Elevate unit per local climate and code requirements to provide clearance above estimated snowfall level and ensure adequate drainage of unit.
!CAUTION
UNIT OPERATION HAZARD
Failure to follow this caution may result in equipment damage or improper operation.
Locate the unit in such a way that it is stable in all circumstances including adverse weather conditions.
In
For refrigerant piping arrangements with equivalent lengths greater than 80 ft. (24.38 m) and/or when elevation difference between indoor and outdoor unit is greater than ±20 ft. (±6.10 m), follow all requirements of the Residential Piping and
IMPORTANT: Flow arrow must point toward outdoor unit.