Electrolux 22-785 Unpacking and Cleaning, Assembly Tools Required, Assembly Time Estimate

Page 8

1

 

2

 

 

 

 

 

 

 

 

 

 

 

 

3

 

 

 

 

 

 

 

 

 

 

 

 

7

 

 

12

 

 

 

 

 

 

 

 

 

8

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

11

 

4

 

5

 

 

 

 

 

 

10

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6

 

 

 

9

 

 

 

 

14

 

 

 

 

 

 

15

16

 

 

 

 

 

 

 

 

 

 

 

 

 

 

13

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fig. 3

 

 

 

 

 

1- Top cover

2- Cord clamp

3- Knife setting gage

4- Open end wrench (14 and 17mm)

5- Open end wrench (10 and 12mm)

6- M6x1x16mm hex flange screw (4) - for fastening top cover to machine

7- Raising and lowering handwheel

8- Handle for raising and lowering handwheel

9- Hex wrench (2.5mm)

10 - Hex wrench (3mm)

11 - Hex wrench (5mm)

12 - Hex wrench (6mm)

13 - Key for raising and lowering handwheel

14 - Decal for raising and lowering handwheel

15 - M10 flat washer for raising and lowering handwheel

16 - M10x1.5 hex nut for raising and lowering handwheel

UNPACKING AND CLEANING

Carefully unpack the machine and all loose items from the shipping container(s). Remove the protective coating from all unpainted surfaces. This coating may be removed with a soft cloth moistened with kerosene (do not use acetone, gasoline or lacquer thinner for this purpose). After cleaning, cover the unpainted surfaces with a good quality household floor paste wax.

ASSEMBLY

ASSEMBLY TOOLS REQUIRED

1)

- Open end wrench (10 and 12mm) - provided

5) - Hex wrench (3mm) - provided

2)

- Open end wrench (14 and 17mm) - provided

6) - Hex wrench (2.5mm) - provided

3)

- Hex wrench (6mm) - provided

7) - 10, 12, 14, 17mm Sockets - not provided

4)

- Hex wrench (5mm) - provided

8) - 2 - 2 x 4’s - not provided

ASSEMBLY TIME ESTIMATE

Assembly for this machine takes approximately 2 hours.

8

Image 8
Contents Planer Table of Contents Important Safety InstructionsSafety Guidelines Definitions California PropositionGeneral Safety Rules Important Safety InstructionsAdditional Specific Safety Rules Refer to them often and use them to instruct othersGrounding Instructions Power ConnectionsMotor Specifications Carton Contents Functional DescriptionAssembly Unpacking and CleaningAssembly Tools Required Assembly Time EstimateCuttinghead Raising and Lowering Handwheel Lifting the MachineOperating Controls and Adjustments Locking Switch in the OFF PositionAssembling TOP Cover and Dust Chute Starting and Stopping PlanerDepth of CUT Adjustment Feed Speed ControlANTI-KICKBACK Fingers Adjusting Belt TensionCHECKING, Adjusting and Replacing Knives Page Adjusting Height Chipbreaker Constructing Gage BlockAdjusting Height Infeed Roller Adjusting Height Outfeed RollerAdjusting Spring Tension of Infeed and Outfeed Rollers Adjusting Table RollersAdjusting Cuttinghead Parallel to Table Troubleshooting Maintenance LubricationWarranty ServiceAccessories Canadian PORTER-CABLE Delta Service Centers