Makita HRH01ZX2 specifications Repair 16/22

Page 16

Repair

P 16/22

 

[3] DISASSEMBLY/ASSEMBLY

[3]-7. Impact bolt in Tool holder complete for BHR262, HR262D)/ Tool holder guide complete for BHR262T, HR262TD (cont.)

ASSEMBLING

1)Assemble Impact bolt section to Tool holder (guide) complete as drawn in Fig. 42.

Fig. 42

Note: The five components are directional, and must be mounted as shown below.

Tool holder (guide) complete

Ring 10

O ring case with

Sleeve 9

O ring 9 fit inside

Impact bolt

Cushion ring 13

Bit (chuck)

 

 

Inner housing

installation

 

 

complete side

side

 

 

 

long

short

 

 

[cross-sectional view]

2)Push Ring spring 28 into the inner groove of Tool holder (guide) complete as drawn in Fig. 43.

Fig. 43

Note: 1) Use an extra Piston cylinder as a jig. Never use Piston cylinder that is to be assembled to the machine.

2)The end gap of Ring spring 28 must not be positioned in either of the two holes of Tool holder (guide) complete.

 

 

Note: 1)

 

Piston cylinder

 

 

Piston cylinder as a jig

as a jig

 

Inner groove of

 

 

 

 

Tool holder (guide)

 

end gap

 

complete

 

Ring spring 28

 

 

 

Tool holder

hole

Ring spring 28

O ring case

 

(guide) complete

 

 

 

hole

 

 

 

Note: 2)

[Correct] [Wrong]

Tool holder (guide) complete

Ring spring 28 end gap

Image 16
Contents Optional accessories SpecificationStandard equipment Variation list BHR262/ HR262DNecessary Repairing Tools RepairRepair DISASSEMBLY/ASSEMBLY DISASSEMBLY/ASSEMBLY DISASSEMBLY/ Assembly Drill chuck assembly for BHR262T, HR262TDAssembling Drill mode Change leverMotor section, Switch M4x12 Hex socket Armature Head bolt 2 pcs Bearing retainer a 12/22 13/22 Needle bearing complete and Oil seal With gentle pressureRepair 15/22 Repair 16/22 Swash bearing 10, Gear section Repair 18/22 Repair 19/22 Maintenance program BHR262/ HR262DCircuit diagram 20/22 LEDWiring diagram Wiring in Handle SectionWiring in Motor Section Fig. D-3