P 6/22
Repair
[3] DISASSEMBLY/ASSEMBLY
[3]
Holder section for Drill chuck of BHR262T, HR262TD (cont.)
ASSEMBLING for BHR262T, HR262TD
(1)Assemble Change ring to Change cover. (Fig. 6)
(2)Assemble Torsion spring 31 to Tool holder, then mount Steel balls 6 to Tool holder. (Fig. 7) Note: Apply Makita Grease RB No.00 to Steel balls 6 to prevent them from falling off.
Fig. 6 | Fig. 7 |
Note:
Face the chamfered end of the hole upward.
Aligning the hole of Change ring with that of Change cover, assemble Change ring to Change cover.
[Section a - a']
a
a'
Change ring
Change cover
Torsion spring 31 | Insert the short arm of |
| Torsion spring 31 into |
| the hole of Tool holder. |
| Tool holder |
long arm |
|
| Steel ball 6 (2pcs.) |
(3)Assemble Tool holder to Change cover. (Fig. 8)
Fig. 8
Insert the long arm of Torsion spring 31 into the hole of Change cover through the hole of Change ring.
Tool holder
The long arm of Torsion spring 31
Change cover
Change ring
By turning Tool holder |
|
approx. 75° clockwise, | 75° |
Tool holder can be |
|
fastened to Change cover. |
|
(4)Put Steel ball 5.0 in the groove surrounded by Change cover and Tool holder. (left in Fig. 9)
(5)Set Leaf spring and Flat washer 24 in change cover, then secure them with Ring spring 21. (right in Fig. 9)
(6)As for the assembling of Cap 35 side, do the reverse of disassembling steps. Refer to Fig. 4.
Fig. 9
Steel ball 5.0 | Ring spring 21 |
| |
Change cover | Flat washer 24 |
Tool holder | Leaf spring |
|
Change cover