4-12. Electrical Service Guide
Failure to follow these electrical service guide recommendations could create an electric shock or fire hazard. These recommenda- tions are for a dedicated branch circuit sized for the rated output and duty cycle of the welding power source.
60 Hertz Models |
|
|
|
|
|
|
|
Input Voltage | 230 | 460 | 575 |
|
|
|
|
Input Amperes At Rated Output | 58 | 29 | 23 |
|
|
|
|
Max Recommended Standard Fuse Rating In Amperes 1 |
|
|
|
70 | 35 | 25 | |
Normal Operating 3 | 90 | 40 | 35 |
|
|
|
|
Min Input Conductor Size In AWG 4 | 6 | 10 | 10 |
|
|
|
|
Max Recommended Input Conductor Length In Feet (Meters) | 145 (44) | 243 (74) | 380 (116) |
|
|
|
|
Min Grounding Conductor Size In AWG 4 | 8 | 10 | 10 |
|
|
|
|
Reference: 2005 National Electrical Code (NEC) |
|
|
|
1If a circuit breaker is used in place of a fuse, choose a circuit breaker with
2
3“Normal Operating” (general purpose − no intentional delay) fuses are UL class “K5” (up to and including 60 amp), and UL class “H” ( 65 amp and above).
4Conductor data in this section specifies conductor size (excluding flexible cord or cable) between the panelboard and the equipment per NEC Table 310.16. If a flexible cord or cable is used, minimum conductor size may increase. See NEC Table 400.5(A) for flexible cord and cable requirements.
4-13. Placing Jumper Links
! Disconnect and lockout/tag- out input power before installing or moving jumper links.
Check input voltage available at site.
1 Jumper Link Label Check label.
2 Jumper Links
Move jumper links to match input voltage.
Close access door, or go on to Section
1
Connect L1(U)
GND/PE L2(V)
Conductor L3(W)
First.
GND/PE
Tools Needed: 3/8 in
3/8 in
Donot |
|
|
overtighten |
|
|
jumper linknuts. | 230VOLTS |
|
Input | 575VOLTS | |
3 |
|
|
Contactor | 460VOLTS | S−174973−B |
2
Ref. 800