3-10. Connecting Input Power
Input Filter
Board
L1
L2
=GND/PE
YAlways connect grounding conductor first.
L3
2
L1
L21
L3
Tools Needed:
5/16 in
ssb2.4* 1/94 –
YTurn Off welding power source, and check voltage on input capacitors ac- cording to Section
Check input voltage available at site.
Remove left side panel.
1Input And Grounding Conductors See Section
Install ring terminals of proper size onto input conductors for connection to input filter board terminals (see illustration).
2 Line Disconnect Device
Select type and size of overcurrent protec- tion using Section
Reinstall left side panel.