Grizzly H7507 owner manual Maintenance, Schedule, Cleaning, Unpainted Cast Iron, Daily Check

Page 27

SECTION 4: MAINTENANCE

Always disconnect power to the machine before performing maintenance. Failure to do this may result in serious person- al injury.

Schedule

For optimum performance from your router table, follow this maintenance schedule and refer to any specific instructions given in this section.

Daily Check:

Loose mounting screws, bolts or locking fas- teners.

Worn router switch.

Worn or damaged router cords and plugs.

Any other condition that could hamper the safe operation of this router table attach- ment.

Model H7507 (Mfg. since 3/05)

Cleaning

Cleaning the Model H7507 is relatively easy. Vacuum excess wood chips and sawdust, and wipe off the remaining dust with a dry cloth. If any resin has built up, use a resin dissolving cleaner to remove it. Treat all unpainted cast iron and steel with a non-staining lubricant after cleaning.

Unpainted Cast Iron

Protect the unpainted cast iron surfaces on the table by wiping the table clean after every use— this ensures moisture from wood dust does not remain on bare metal surfaces.

Keep tables rust-free with regular applications of products like G96® Gun Treatment, SLIPIT®, or Boeshield® T-9.

-25-

Image 27
Contents Model H7507 Router Table Extension Ss ,EAD from Leadbased PAINTS Table of Contents Introduction Manual Accuracy Machine DescriptionContact Info Identification Safety Instructions for Machinery SafetyModel H7507 Mfg. since 3/05 Additional Safety for Router Tables Description Qty SetupNeeded for Setup UnpackingGuard Box Contents Figures 1 QtyInventory Hardware and Tools Not Shown Router TableHardware Recognition Chart Before cleaning, gather the following ™ 9hedhVWaZGV\h CleanupTo assemble and install your router table extension wing AssemblyExcess masking tape with a razor blade To mount a router to the router table Mounting RouterRouter Guard To make a shop made fence and install the router guardStep Make a 28 long fence that is 23⁄4 tall ¿ - Recommended CFM at Dust Port 225 CFM Dust CollectionOperation Overview OperationsTo joint the edge of a workpiece Workpiece InspectionTable Inserts Edge JointingEdge jointing guard removed for Clarity To make a zero-clearance fence Groove CuttingRouting Small Stock To cut a groove into the face of the workpieceFree-Hand Routing GdjiZg IVWaZ Unpainted Cast Iron MaintenanceCleaning ScheduleMain Parts10. 8dbbZcih Warranty Card99.$5342!, .# 0//88 %,,.!- 7!  Warranty and Returns Order Hours a DAY