Thermo Products Models from 8 kW to 24 kW : 240 Volts ( single phase ) BI-ENERGY Setup

Page 9

3.11 BI-ENERGY SETUP

To take advantage of a special domestic electric utility rate, your COMBOMAXMC boiler can be combined with an existing oil or gas-fired furnace. Please contact your utility to make sure your building is eligible and to find out about the new wiring configuration. Please refer to figures 7 and 8 for the set-up required.

The CBE-EM bi-energy switching control (available as an option) is especially designed to satisfy utility requirements. The CBE-EM control selects the cheapest energy source according to the outdoor temperature, the indoor temperature setting and any signal provided by the utility.

The CBE-EM bi-energy control starts up the oil burner upon receiving the appropriate signal, even if the thermostat is sending no heating signal. The oil burner stops when the boiler reaches its high-limit point. For this reason, the plumbing system must be equipped with a flow check valve or zone valves.

The 3-way zone valve (1’’ NPT F) which comes with the CBE-EM control, directs the heating water to the oil burner or the COMBOMAXMC unit depending on the signal sent to it by the external bi-energy sensor. Thus, your oil burner can cool down while eliminating energy losses up the chimney or by conduction in the furnace room .

COMBOMAXMC Electric boiler Set-up, use and care guide (revised January 2006), Page 9.

Image 9
Contents Combomax Boiler specifications 240 Vac single phase Technical specificationsBoiler and connection dimensions Domestic hot water production capacity in US gallonsDIMENSION/ Dimensional Checklist Local Installation RegulationsIntroduction Corrosive AtmosphereInstallation Pressure relief valve Flow-check valveOperating pressure control expansion tank Makeup valveConnecting the domestic hot water piping Domestic HOT Water CircuitExpansion tank on the cold water supply line Boiler Wiring Circulator WiringPrioritizing Terminal Post BI-ENERGY Setup Operation Adjusting the AquastatsFilling the Tank Filling the Heating CoilDomestic HOT Water Startup Startup ProcedureAdjusting the Mixing Valve Maintenance General Safety Precautions Combomax Schéma dinstallation général/ General installation Système primaire/secondaire TH1 TH2 EL1 EL2 TH1 EL1 TH2 EL2 24 Vac Bi-énergie avec Valve 3 Voies/ Dual Energy with 3-way valve Diagramme électrique/ Wiri ng diagram Thermo 2000 inc Panneau de contrôlel Control pannel Combomax TM Limited Warranty