HP
MPEGscope
manual
Introduction, For More Information How To Contact Us
Troubleshooting
Specifications
Install
GND Signal
Safety Symbols
Connecting to Interfaces
Setup dialog for instructions
Type Biphase mark
Performing a System Backup
Performing a System Restore
Page 11
1
•
For More Information
1-3
•
How To Contact Us
1-4
Introduction
Page 10
Page 12
Image 11
Page 10
Page 12
Contents
MPEGscope Startup Guide
Product Number
Copyright Warranty MPEGscope Microsoft
Pentium Acrobat Printing history
Manual Name
Additional Information for Test and Measurement Equipment
Safety Symbols
Indicates that antistatic precautions should be taken
Certification
Avertissement
Symboles de sécurité
Avertissement
Cet instrument est conforme aux
Page
Page
Page
Contents
Page
Introduction
For More Information How To Contact Us
Materials shipped with your MPEGscope system
System to enable you to become quickly productive
Introduction For More Information
For More Information
How To Contact Us
Getting Started
Starting an MPEGscope Test Session
Software, refer to Appendix B, Reinstalling Software
Getting Started Starting an MPEGscope Test Session
Getting Started Connecting to Interfaces
Connecting to Interfaces
Getting Started Connecting to Interfaces
To Connect to the DVB-SPI Interface
To Connect to the ASI and Serial ECL Dhei Interface
M2S Mode
Connect the Amplimite TM HD-22
Getting Started Connecting to Interfaces Dhei Interface
DVB-SPI Rx
To Connect to the Smpte 310M Interface
Port on the MPEGscope Main Board. Outspi
To Connect to the Arib Interface
Getting Started Connecting an External Clock Source
Connecting an External Clock Source
To see the list of relevant topics
Connecting an External Trigger Cable
Setup dialog for instructions
Getting Started Troubleshooting
Troubleshooting
Select Start
Technical A-2 General A-5 Line Interface A-6
Specifications
Technical
Broadcasting
Specifications Technical
Service information
SI in DVB systems
2000
Circuits
Stream, September
December
General
Line Interface
Packets
Type Biphase mark
16 Mb/s
Clock 100 ns
EXP INe
Pin
SPI 25b
DHEId
Pin ARIBa Data TPD7 MSB Data TPD6 Data TPD5
GND Signal
Arib in connector
Page
Reinstalling Software
Reinstalling Software
Reinstalling Software
Reinstalling Software Performing a System Backup
Performing a System Backup
Reinstalling Software Performing a System Restore
Performing a System Restore
Index-1
Cables
Top margin for text
Index-2
Related pages
All How to page
Input the Date and notes when you add an item for LG Electronics CU720
Appears when the tape ends during recording or playback for JVC GR-DF473
HOW to Plug in the Power Cord for ProForm PFTL57807.0
HOW to Plug in the Power Cord for ProForm PFTL91330
HOW to Turn on the Power for NordicTrack 30703.0
HOW to Connect Your Portable Stereo for ProForm PFTL71230
The PUMP-RUN, PUMP-STOP,and ENABLE IN inputs operate from an internal 5 VDC source and each one draws approximately 0.008 amps when connected to COM. To activate either the PUMP- RUN, PUMP-STOP,or ENABLE IN input connect it to COM. Any device capable of switching 0.008 amps can be connected between the PUMP-RUN, PUMP-STOP,or ENABLE IN input and COM, such as: a switch contact, a relay contact, an open collector output, an open drain output, or any output with a high logic level output of 3.8 to 6.0 volts and a low logic level output of 0.0 to 0.5 volts. A switch contact or a relay contact is preferred since this type of connection will provide isolation between the pump and the controlling device. The COM terminal is internally connected to the pumps chassis ground and should be connected to the controlling devices ground or zero volt terminal when the controlling device has an open collector output, an open drain output, or any output with logic level output for SSI America 90-2581 REV B
When Using the Mac OS X for Pioneer CDJ-350
1PLAY/PAUSE button when an image you like appears for Samsung HT-Q9
When an AW-PH350 is used for Panasonic AW-DU600
Can I view the
Dayton heater parts manual
online?
Top
Page
Image
Contents