Sterling 882.00440.00 SC6-610.6 specifications Assembling the Cooling Tower in the Field

Page 12

3-2 Assembling the Cooling Tower in the Field

Your cooling tower may have been shipped on two skids to reduce shipping charges.

One skid contains the lower section, identified by the black fill wrapped in plastic on the inside of the lower section. The second skid contains the top tower section bolted over the fan/motor assembly. Perform the following procedure to properly assemble the two sections if the sections shipped separately.

1.Remove the clear plastic protective wrapping from the fill.

2.Inspect both sections for any damage, and locate the red orientation mark on one of the vertical sides of each section.

3.The manufacturer supplies self-adhesive gasketing material to insure a water-tight seal between the top and bottom sections. Install this material on the top of the attachment flange on the lower section prior to mating the top and bottom sections. Make sure that the flange is clean, dry, and free of rough spots before applying the gasketing material.

4.Align the holes in the gasket with the bolt holes in the flange, then remove the paper on the back side. Cut the gasketing material to fit properly, and apply the gasket to the flange as you realign gasket holes with flange holes. Repeat on all four sides of the tower.

5.Apply silicone caulk in cut lines and voids to complete sealing between sections.

6.Unbolt the top section from the skid and make sure that the flange on the top section is clean, dry, and free of rough spots.

7.Place the upper section on the gasketed lower section, aligning the red orientation marks. Take care not to disturb the gasketing and silicone caulk while aligning bolt holes.

8.After aligning, bolt the two sections together with the fasteners provided. Use a flat washer under the bolt head on top and a flat washer, a lock washer, and nut on the bottom side of the flange.

Fiberglass Cooling Towers

Chapter 3: Installation

Page 12 of 25

Image 12
Contents Fiberglass Cooling Towers Shipping Information Table of Contents Parts List Electrical Schematics List of Figures Structural Steel Support RequirementsSafety How to Use This ManualSafety Symbols Used in this Manual Responsibility Standard Features Functional DescriptionModels Covered in This Manual General DescriptionOptional Features Installation Tower Installation LocationRoof Installation Ground InstallationStructural Steel Support Requirements Assembling the Cooling Tower in the Field Installing the Fan Package Installing PipingRigging Tower water Flexible PVC Outlet Coupler Setting Up the Water Balancing Valve Initial Start-upOperation Bleed-Off and Evaporation RatesWinter Operation Considerations Maintenance Preventative MaintenanceRoutine Maintenance Water TreatmentCorrective Maintenance Replacing Nozzles and FillAppendix Technical AssistanceDrawings and Specifications Top ViewTower Performancec Cooling Tower Nozzle Capacity Parts List SF2004 SF2005 d SF2007 SF2009 SF2011 SF2015 Description QtyElectrical Schematics Typical Wiring Diagram

882.00440.00 SC6-610.6 specifications

The Sterling 882.00440.00 SC6-610.6 is a reliable and versatile tool that has been designed to meet the needs of both professional tradespeople and DIY enthusiasts. Known for its durability and efficiency, this equipment integrates advanced technologies to enhance performance across various applications.

At the core of the Sterling 882.00440.00 SC6-610.6 is its robust construction, engineered to withstand the rigors of demanding work environments. The body is made from high-quality materials that resist wear and tear, ensuring longevity and consistent performance over time. This feature makes it an ideal choice for heavy-duty tasks while also being lightweight enough to facilitate ease of handling.

One of the standout characteristics of this tool is its ergonomic design. The handle is crafted with user comfort in mind, featuring a non-slip grip that allows for extended use without causing fatigue. This is particularly beneficial for professionals who may be using the equipment for long hours. Additionally, the balanced weight distribution enhances control and precision, allowing for more accurate operation.

The Sterling 882.00440.00 SC6-610.6 is equipped with cutting-edge technology that promotes efficiency. The tool includes an adjustable speed mechanism, enabling users to tailor the performance according to the task at hand. This feature is crucial when working with different materials, as it allows for optimal results whether drilling, cutting, or fastening.

Moreover, safety is a paramount concern with the Sterling 882.00440.00 SC6-610.6. It incorporates several safety mechanisms, such as automatic shut-off features and protective shields, which minimize the risk of accidents during operation. This is particularly important in professional settings where safety regulations must be adhered to.

Another remarkable aspect of this tool is its compatibility with a wide range of accessories and attachments, making it highly adaptable to various tasks. This versatility enhances its functionality, allowing users to streamline their workflow and tackle different projects without the need for multiple devices.

In summary, the Sterling 882.00440.00 SC6-610.6 stands out in the market due to its durable construction, ergonomic design, advanced technology, and safety features. Whether you are a seasoned professional or an aspiring DIYer, this tool promises to deliver exceptional performance and reliability, making it an essential addition to any toolkit.