Sterling RF-75, RF-60, RF-90, RF-45, RF-30 specifications

Page 32
Image 32
Contents Tubular GAS Fired Direct Spark Propeller Unit Heaters Receiving InstructionsTable of Contents DescriptionGeneral Safety Information Dimensional Drawing Tubular 30 thru 90 Propeller Unit Heater Installation Installation Gas Pipe Size GAS PipingPipe Sizing Pipe Installation Gas Piping RequirementsThermostat Wiring and Location Electrical ConnectionsElectrical Connections Venting into an unlined masonry chimney is prohibited Additional Requirements for Canadian InstallationsVenting Vertically Vented Unit Heaters Category Venting CategoriesNot apply to equipment specified Within this manualVent Systems Termination Clearance Requirements Structure Category I Horizontal Venting Requirements Vent Maximum Number Maximum Horizontal Minimum ExtensionVent Support Horizontally Vented Unit Heaters Category Type B Draft Hood Connector Venting Venting Operation Explanation of Controls See FigureDetermine and Correct the Cause of the flame roll-out Shut DownPrimary AIR Shutter Adjustment GAS Input RateMain Burner Orifice Schedule Tubular Unit Heater High Altitude DerationPeriodic Service Never over oil the motor or premature failure may occurTubular Propeller Troubleshooting Guide Symptoms Possible Causes Corrective ActionRealign power ventor wheel Check for continuous 115v on terminal Troubleshooting with LED Indicator Assistance LED Status Indicates CHECK/REPAIRItemDescription Propeller Parts HOW to Order Replacement Parts With power and gas off With power and gas onPRE-INSPECTION Information General