Sterling RF-90, RF-60, RF-75, RF-45 Venting, Additional Requirements for Canadian Installations

Page 11

VENTING*

All unit heaters must be vented! All Venting installations shall be in accordance with the latest edition of Part 7, Venting of Equipment of the National Fuel Gas Code, ANSI Z223.1, or applicable provisions of local building codes. Refer to notes* below for Canadian installations. Refer to Figures 12-19.

CARBON MONOXIDE! Your venting system must not be blocked by any snow, snow drifts, or any foreign matter. Inspect your venting system to ensure adequate ventilation exists at all times! Failure to heed these warnings could result in Carbon Monoxide Poisoning (symptoms include grogginess, lethargy, inappropriate tiredness, or flu-like symptoms).

When an existing heater is removed or replaced in venting system, the venting system may not be properly sized to vent the attached appliances. An improperly sized vent system can cause formulation of condensate or leakage or spillage of flue gases.

The following steps shall be followed with each appliance connected to the venting system placed in operation, while any other appliances connected to the venting system are not in operation:

1.Seal any unused openings in the venting system;

2.Inspect the venting system for proper size and horizontal pitch, as required in the National Fuel Gas Code, ANSI Z223.1 and these instructions. Determine that there is no blockage or restriction, leakage, corrosion and other deficiencies, which could cause an unsafe condition.

3.In so far as practical, close all building doors and windows and all doors between the space in which the appliance(s) connected to the venting system are located and other spaces of the building. Turn on clothes dryers and any exhaust fans, such as range hoods and bathroom exhausts, so they shall operate at maximum speed. Do not operate a summer exhaust fan. Close fireplace damper.

4.Follow the lighting instructions. Place the appliance being inspected in operation. Adjust thermostat so that the appliance will operate continuously.

5.After it has been determined that each appliance connected to the venting system properly vents when tested as outline above, return doors, windows, exhaust fans, fireplace dampers, and any other gas-burning appliance to their previous condition of use.

6.If improper venting is observed during any of the above tests, the venting system must be corrected immediately so that the system conforms with the National Fuel Gas Code, ANSI Z223.1. When resizing any portion of the venting system, the venting system should be resized to approach the minimum size as determined using the appropriate tables in Appendix G of the National Fuel Gas Code, ANSI Z223.1.

The unit heater shall be connected to a factory built chimney or vent complying with a recognized standard, or a masonry or concrete chimney lined with a lining material acceptable to the authority having jurisdiction.

Venting into an unlined masonry chimney is prohibited.

ADDITIONAL REQUIREMENTS FOR CANADIAN INSTALLATIONS

*The following instructions apply to Canadian installations in addition to installation and operating instructions.

1.Installation must conform with local building codes, or in the absence of local codes, with current CGA-B149.1, Installation Codes for Natural Gas Burning Appliances and Equipment, or CGA-B149.2, Installation Codes for Propane Gas Burning Appliances and Equipment.

2.Any reference to U.S. standards or codes in these instructions are to be ignored and the applicable Canadian standards or codes applied.

11

Image 11
Contents Receiving Instructions Tubular GAS Fired Direct Spark Propeller Unit HeatersDescription Table of ContentsGeneral Safety Information Dimensional Drawing Tubular 30 thru 90 Propeller Unit Heater Installation Installation Gas Pipe Size GAS PipingPipe Sizing Gas Piping Requirements Pipe InstallationElectrical Connections Thermostat Wiring and LocationElectrical Connections Venting into an unlined masonry chimney is prohibited Additional Requirements for Canadian InstallationsVenting Within this manual Vertically Vented Unit Heaters CategoryVenting Categories Not apply to equipment specifiedVent Systems Termination Clearance Requirements Structure Vent Maximum Number Maximum Horizontal Minimum Extension Category I Horizontal Venting RequirementsVent Support Horizontally Vented Unit Heaters Category Type B Draft Hood Connector Venting Venting Shut Down OperationExplanation of Controls See Figure Determine and Correct the Cause of the flame roll-outTubular Unit Heater High Altitude Deration Primary AIR Shutter AdjustmentGAS Input Rate Main Burner Orifice ScheduleNever over oil the motor or premature failure may occur Periodic ServiceSymptoms Possible Causes Corrective Action Tubular Propeller Troubleshooting GuideRealign power ventor wheel Check for continuous 115v on terminal LED Status Indicates CHECK/REPAIR Troubleshooting with LED Indicator AssistanceItemDescription Propeller Parts HOW to Order Replacement Parts General With power and gas offWith power and gas on PRE-INSPECTION Information