IDENTIFICATION OF PARTS

RESIDENTIAL TUBULAR 30-90 MBH UNIT SIZES

Item

 

No.

ItemDescription

 

 

1

Vestible Panel/Tube Ass’y

(Heat Exchanger)

 

 

 

2

Manifold Bracket Sub-Ass’y

 

 

3

Manifold

 

 

4

Inshot Burner

 

 

5

*Standard Orifice

Natural Gas or Propane (LP) Gas

 

 

 

6

Spark Ignitor

 

 

7

Flame Sensor

 

 

8

Gas Valve, Single Stage

Natural or Propane (LP) Gas

 

 

 

9

Manual Rollout Safety Switch

 

 

10

Transformer, 50 VA, 115/24

 

 

11

Air Pressure Switch

 

 

12

Terminal Block Plate

 

 

13

High Limit Switch

w/Mounting Bracket

 

 

 

14

Fan Motor

 

 

15

OSHA Fan Guard

 

 

16

Standard Fan

 

 

17

Fan/Guard/Motor Mount

Hardware Kit

 

 

 

18

**Flue Collector

 

 

19

Power Venter (Drafter) Ass’y

 

 

20

Flue Collar Ass’y

 

 

21

Vinyl Tubing (Pressure Switch)

 

 

22

Power Venter Mounting Plate

 

 

23

Louver

 

 

24

Louver Spring

 

 

25

Control Board

 

 

26

Service Panel

 

 

27

Top Jacket Panel w/Insulation

 

 

27

Bottom Jacket Panel w/Insulation

 

 

29

Front Jacket

 

 

30

Rear Jacket

 

 

31

Front Hanger

 

 

31

Rear Hanger

 

 

32

Tube Support Bracket

 

 

33

Green Ground Screw

 

 

* The orifices shown are for units operating at normal altitudes of 0 to 2000 ft. (610m).

** When replacing a flue collector, make sure that the flue collector box is sealed completely to the vestibule panel using RTV Sealant.

27

Image 27
Contents Receiving Instructions Tubular GAS Fired Direct Spark Propeller Unit HeatersDescription Table of ContentsGeneral Safety Information Dimensional Drawing Tubular 30 thru 90 Propeller Unit Heater Installation Installation GAS Piping Pipe SizingGas Pipe Size Gas Piping Requirements Pipe InstallationElectrical Connections Thermostat Wiring and LocationElectrical Connections Additional Requirements for Canadian Installations VentingVenting into an unlined masonry chimney is prohibited Within this manual Vertically Vented Unit Heaters CategoryVenting Categories Not apply to equipment specifiedVent Systems Termination Clearance Requirements Structure Vent Maximum Number Maximum Horizontal Minimum Extension Category I Horizontal Venting RequirementsVent Support Horizontally Vented Unit Heaters Category Type B Draft Hood Connector Venting Venting Shut Down OperationExplanation of Controls See Figure Determine and Correct the Cause of the flame roll-outTubular Unit Heater High Altitude Deration Primary AIR Shutter AdjustmentGAS Input Rate Main Burner Orifice ScheduleNever over oil the motor or premature failure may occur Periodic ServiceSymptoms Possible Causes Corrective Action Tubular Propeller Troubleshooting GuideRealign power ventor wheel Check for continuous 115v on terminal LED Status Indicates CHECK/REPAIR Troubleshooting with LED Indicator AssistanceItemDescription Propeller Parts HOW to Order Replacement Parts General With power and gas offWith power and gas on PRE-INSPECTION Information