Thermo Products CHB1-100N Initial Start UP, Operating Instructions, Adjustment of BTU Input Rate

Page 42

All installations and services must be performed by qualified service personnel.

B. INITIAL START UP:

This furnace does not have a pilot. It is equipped with a hot surface igniter, which automatically lights the burner. Do not attempt to light the burner by hand. Check the following items before the initial start-up.

1.Check all wiring for loose connections and proper hook up.

2.Leak test gas piping connections.

3.Check all tubing to the pressure switch and drains to make sure they are connected firmly at all their connection points.

4.Check flue pipe, combustion air inlet and all PVC connections for tightness and to make sure there is no blockage.

5.Make sure air filter is in place.

6.Make sure the outside vent and air intakes are installed according to instructions and that they are free from blockage.

7.Make sure that the drain trap is properly connected to the furnace and to the buildings drain system.

OPERATING INSTRUCTIONS:

: Turn off power to furnace before it is placed into service. The gas piping system must have been leak tested by a qualified heating contractor. (See Section III, J, of these instructions on the installation of gas piping).

: It may be necessary to purge the air out of the gas line for initial start-up of the furnace after installation. This should be done by a qualified heating contractor. If excessive gas escapes when purging the gas supply at the union, allow the area to ventilate for at least 15 minutes before attempting to start the furnace. LP gas is especially dangerous because the specific gravity of LP gas allows it to accumulate at floor level at a dangerous concentration. For remainder of operating instructions, reference Users Information Manual.

: Heat exchanger oil will burn off on initial firing creating an unpleasant odor. To prevent this odor from occurring more than once, it is suggested that:

1.A window(s) be opened.

2.The thermostat be set at highest setting.

3.The furnace remain running at conditions 1&2 for 30 minutes or until odor has dissipated.

C. ADJUSTMENT OF BTU INPUT RATE

The Orifice for this furnace was sized: 1) for natural gas having a heating value of 1025 BTU per cubic foot and a specific gravity of .65, or 2) for liquefied propane gas with a heating value of 2500 BTU per cubic foot and a specific gravity of 1.55. The information plate inside the furnace vestibule will specify which gas your furnace is orificed for. If the furnace is installed at an altitude that is more than 2,000 feet above sea level, it is mandatory that the input to the burner be reduced 4.0% for every 1,000 feet that it is above sea level. If the furnace is installed at an elevation of 5,000 feet, its input must be reduced 20.0%. Example: a furnace rated at 100,000 BTU at sea level must be reduced to a firing rate of 80,000 (100,000 X .80 = 80,000) at an elevation of 5,000 feet. If the furnace is installed at an elevation of 2,000 feet or less, no reduction in input is required. Your gas supplier will supply you with the correct orifice sizing information.

To check the input of your natural gas furnace, allow the unit to operate for 10 to 15 minutes and proceed as follows:

a.Call your gas supplier and ask for the BTU content (heating value) of one cubic foot of the gas, supplied to the installation area. An alternate approach is to assume a value of 1025 BTU/Cu Ft, which is the national average.

b.With all other gas appliances turned off and using a stopwatch, clock the time required for the (small) dial on the gas meter to make one full revolution. The meter will state how many cubic feet is flowed for one revolution usually one, two or five. The unit must have been in operation at least 10 minutes before clocking.

36

Image 42
Contents Condensing GAS Furnace Safety Information 390540 Iii Page Index Section Beginning BTU/HR Output II. Furnace Specifications CHB1 Series Model noBTU/HR Input HT. of CasingCDB1 Series Model no Installation Parts Packages CHB1-50/75 Description Quantity Installation Parts Packages CDB1-50/75 Description Quantity III. General Installation Codes and ClearancesFurnace Location B1. CDB1 Horizontal Application Page General Requirements For Venting Models CHB1 / CDB1 Not Permitted Direct Venting Through a Sidewall Page Page E1. Single-Pipe Sidewall Venting Option Optional Direct Vent Terminations Conentric Vent KIT Side Wall Vent KIT Required Exhaust Vent and Air Intake Piping for CHB1 Furnace Page Page Page Page Condensate Trap Assembly Mounted On the Model Series CHB1 Page Page General GAS Piping J1. Requirements and Sizing of Duct Work Page Page Filters CHB1 Models Highboys CDB1 Models CounterflowsUSE of NON-THERMO Pride Filter Retention Means CHB1,CDB1-50 CHB1,CDB1-75 CHB1,CDB1-100 CHB1,CDB1-125Wiring Electronic AIR Cleaner EAC and Humidifier InstallationThermostat Anticipator Setting Blower Motor Speed Wiring Blower Delay Settings Field Wiring and Replacing WiringCDB1 Series only Page Adjustment of BTU Input Rate Initial Start UPOperating Instructions GAS Pressure Chart for ALL CHB1 Model Furnaces Burner AdjustmentFurnace Checkout Procedure Installers Instructions to User VI. Troubleshooting Diagnostic FeaturesRoom Temp Surface Diagnostic LED LAMP. Reset by AT the HOT Surface Time Delay For Proper Voltage SECONDS? Yes Appendix -A Replacement Parts List Page Page Page Appendix B Wiring Diagrams

CHB1-50N, CBD1-50N, CBD1-125N, CBD1-100N, CBD1-75N specifications

Thermo Products offers a range of high-performance heating and cooling solutions tailored to meet the demands of both residential and commercial applications. Among their innovative offerings are the CHB1-50N, CBD1-75N, CHB1-100N, CHB1-125N, and CBD1-100N models, which are designed to provide efficient temperature control while maximizing energy savings.

The CHB1 series, including the CHB1-50N, CHB1-100N, and CHB1-125N, features advanced heating technologies that allow for rapid heating response times. These units are equipped with high-efficiency heat exchangers that ensure optimal heat transfer with minimal energy consumption. A key characteristic of these models is their ability to operate quietly, making them ideal for settings where noise reduction is a priority.

In comparison, the CBD1 series, specifically the CBD1-75N and CBD1-100N, focuses on cooling capabilities that are equally impressive. These units utilize state-of-the-art cooling compressors designed to provide powerful cooling while maintaining low operational costs. The CBD1 models incorporate environmentally friendly refrigerants, ensuring compliance with the latest environmental regulations, which appeals to environmentally conscious customers.

All models in this lineup are designed with user friendliness in mind, featuring intuitive digital controls that allow for precise temperature adjustments. This makes them suitable for end users with varying levels of technical expertise. Additionally, the units support smart home integration, enabling remote monitoring and control via mobile apps, which enhances comfort and convenience for users.

Durability is another hallmark of Thermo Products. The robust construction of both the CHB1 and CBD1 series units ensures resilience against harsh weather conditions and prolonged usage. Furthermore, they come equipped with advanced safety features, including over-temperature protection and automatic shut-off mechanisms, which provide peace of mind for consumers.

In summary, the Thermo Products CHB1-50N, CBD1-75N, CHB1-100N, CHB1-125N, and CBD1-100N models represent a comprehensive solution for effective heating and cooling needs. With their blend of efficiency, innovative technologies, user-friendly design, and durability, these products are positioned to deliver exceptional value and performance in a variety of environments.