Toshiba RAS-13UAV-E2, RAS-13UKV-E2 service manual Figure below

Page 74

 

 

 

 

FILE NO. SVM-03008

 

 

 

 

 

 

No.

Part name

 

Procedures

 

Remarks

 

 

 

 

 

 

 

 

4

Heat exchanger

1)

Remove the front panel, electrical part and the

 

 

 

 

 

 

 

horizontal louver with the procedure 3.

 

 

 

 

 

 

2)

Remove the pipe holder on the rear side of the

 

 

 

 

 

 

 

main unit.

 

 

 

 

 

 

3)

Remove 2 screws of the heat exchanger on the

 

 

 

 

 

 

 

 

 

 

 

 

 

base bearing side.

 

 

 

 

 

 

4) Remove 2 screws of the heat exchanger on the

 

 

Pipe holder

 

 

 

left side (upper and lower) from the back body,

2

 

 

 

and then pull out the upper side of the heat

 

 

 

 

 

 

 

exchanger slowly.

 

 

 

 

3 2-Screws

4 2-Screws

5

Fan motor

1) Remove the front panel and the electrical part

Mounting the fan motor as shown in

 

 

 

with the procedure 2.

figure below.

 

 

2)

Loosen the set screw of the cross flow fan.

 

 

 

3)

Remove 2 screws fixing the motor band (R).

 

 

 

4)

Pull out the fan motor.

 

Connector cover

Reference line

Pull out the lead wires of the fan motor from this hole.

Reference line

When mouting the fan motor, put the R end of the connector cover this reference line.

– 73 –

Image 74
Contents AIR Conditioner Contents HOW to Replace the Main Parts Specifications SpecificationsOperation Characteristic Curve Capacity Variation Ratio According to TemperatureRefrigerant R410A Safety During Installation/ServicingRefrigerant Piping Installation Piping materials and joints usedOuter diameter mm R410A R22 1 Thicknesses of annealed copper pipesThickness mm Processing of piping materialsWidth Flare tool for R410A Conventional flare toolClutch type Wing nut type Diameter·m kgf·cm ·m kgf·mGeneral tools Conventional tools can be used ToolsRequired tools 1 Configuration of refrigerant charging Recharging of RefrigerantBrazing of Pipes Activated flux Characteristics required for fluxTypes of flux Noncorrosive flux BrazingIndoor Unit 215Outdoor Unit Cover PVCheck Item Diagnosis Result Wiring Diagram1 Simple Check for Failure Diagnosis BRW Parts name Specification of Electrical PartsSpecifications RatingRefrigerant Cycle Diagram Refrigerant Cycle DiagramOperation Data Control Block Diagram RaysOutdoor Unit Inverter Assembly MCC813P.C.BOperation Description Outlined of Air Conditioner Control1 Compressor revolution range Operation Model Power factor improvement controlCapacity control Revolution rpsLouver control Prevent-freezing control5. P.M.V. Pulse Modulating Valve Indoor fan control DC fan motorCompressor revolution rps From Outdoor fan control DC fan motorModel name Description of Operation Circuit Cooling capacity controlLimit for maximum compressor motor speed By indoor fan speedBasic control Heating operationHigh-temp. release control Starting and in stability StabilityHeating capacity control Defrost controlAutomatic operation TimeTemporary auto operation Temporary OperationTemporary button Control Temporary cooling operationWhen the unit is in operation Operation How to set auto restart functionWhen the unit is on standby Not operating Operation Auto Restart FunctionFilter Check Lamp Remote Control and its Functions Timer and clock time display Mode displayTemperature display Hi-POWER displayFile NO. SVM-03008 To Disconnect the Appliance from the Main Power Supply Installation ProcedureSafety Cautions File NO. SVM-03008 Installation Diagram of Indoor and Outdoor Units AttachOptional installation parts Part Parts name ’ty Code Fixing bolt arrangement of outdoor unitName Accessory and installation partsOthers OptionNew tools for R410A Applicable to R22 model Changes Mounting the installation plate Installation placeRemote controller Cutting a holeWhen the installation plate is directly mounted on the wall Electrical workChanging drain hose How to remove the Drains CapDie-cutting Front panel slit Left-hand connection with piping How to fix the Drains CapCase of right or left piping Case of bottom right or bottom left pipingIndoor unit fixing Drainage Run the drain hose sloped downwardsR410A Conventional Copper pipe Tool used Refrigerant piping connection FlaringProjection margin in flaring a Unit mm Copper pipe Tightening connectionShaping pipes Using a vacuum pumpOuter dia Tightening torque Copper pipe EvacuatingStripping length of connection cable Packed valve handling precautionsWiring connection Gas leak test Auto restart settingHow to set the auto restart Test operationHOW to Diagnose the Trouble First ConfirmationOperation of air conditioner Description Primary JudgmentOperation which is not a trouble Program operation Indoorindication Judgment by Flashing LED of Indoor UnitSelf-Diagnosis by Remote Control Check Code How to use remote control in service modeCause of operation Short circuit. Replace Judgment of Trouble by Every Symptom Check ItemTurn on power supply Only indoor fan motor does not operate Primary check YESInspection procedure Troubleshooting for remote control Pipe clogging Check Code 1C Miswiring in indoor/outdoor units and 1E Check procedureHow to Diagnose Trouble in Outdoor Unit AGE on P.C. boardInspection procedures How to Check Simply the Main PartsDiagnosis/Process flowchart Contents Summary Main P.C. board partCheck procedures Procedure Check points Symptom Causes OPERATION, TIMER, PRE. DEFBottom View Sensor characteristic table10-8-2. P.C. board layout Indoor unit Other parts Part name Checking procedure Outdoor unit Part name Checking procedureChecking Method for Each Part Part name Checking procedure Diode check Igbt checkSymptom CauseHOW to Replace the Main Parts Part name Procedures RemarksFigure below For position of the fan motor connector Microcomputer Detachment Requirement Connector is one Assembly to other parts Fan motor Perform work of item 1 of 1 Set take-out part of the lead wire of coil to Part name Board layout MCC-813 Exploded Views and Parts List Indoor Unit E-Parts AssyFront Panel Assy Cabinet, Front, Assy Outdoor Unit E-Parts Assy Toshiba Carrier Corporation

RAS-13UAV-E2, RAS-13UKV-E2 specifications

The Toshiba RAS-13UKV-E2 and RAS-13UAV-E2 air conditioning units represent a significant step forward in both comfort and energy efficiency. Designed for residential and light commercial use, these models are packed with features that cater to diverse climate control needs while adhering to modern standards of sustainability.

One of the standout features of both models is the implementation of inverter technology. This advanced system allows for more precise temperature control by adjusting the compressor speed based on the ambient temperature requirements. This not only enhances energy efficiency but also ensures a quieter operation compared to traditional air conditioning systems. As a result, users benefit from consistent comfort without the disruptive sounds often associated with cooling units.

The RAS-13UKV-E2 and RAS-13UAV-E2 also feature a high energy efficiency rating, which is crucial for reducing electricity bills. The Seasonal Energy Efficiency Ratio (SEER) is a vital measure of energy efficiency over an entire cooling season. Both units excel in this regard, making them an environmentally friendly choice. This is further supported by Toshiba's commitment to incorporating R32 refrigerant, known for its lower environmental impact compared to older refrigerants.

User convenience is enhanced with integrated smart controls. Both models are compatible with wireless remote control features, allowing for easy adjustments from a distance. This is complemented by programmable settings that let users schedule operation times, ensuring that the units run only when needed, which further optimizes energy consumption.

Design-wise, these air conditioners boast a sleek and modern appearance, making them a visually appealing addition to any room. They are constructed with durable materials that ensure longevity and reliability. Moreover, the filters are designed for easy maintenance, ensuring cleaner indoor air quality and prolonging the lifespan of the unit.

The Toshiba RAS-13UKV-E2 and RAS-13UAV-E2 units also come equipped with advanced air purification technologies. These features help to reduce airborne pollutants and allergens, contributing to a healthier indoor environment. With exceptional cooling and heating capabilities, easy installation, and advanced features, these models are designed to meet the modern user's needs for comfort, efficiency, and health. Overall, they represent an excellent investment in both cooling technology and eco-friendly practices.