HP 422690 I manual Allowable Pipe Length feet

Page 10

Table 2. Maximum Pipe Length --Non-Direct Vent

 

 

 

 

 

ALLOWABLE PIPE LENGTH (feet)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ALTITUDE

FURNACE

 

PIPE

 

NUMBER OF SWEEP ELBOWS (SEE NOTE 1)

 

 

 

 

 

INPUT

 

DIA.

1

2

3

 

4

 

5

6

7

8

 

 

 

 

54,000

2"

112

108

104

 

100

 

96

92

88

84

 

 

 

 

72,000

2"

55

51

47

43

 

39

35

31

27

 

 

 

 

72,000

3"

150

150

150

150

 

150

150

150

150

 

 

 

0'-1000'

90,000

2"

36

32

28

24

 

20

16

-

-

 

 

 

 

90,000

3"

150

150

150

145

 

140

135

130

125

 

 

 

 

108,000

3"

85

80

75

70

 

65

60

55

50

 

 

 

 

126,000

3"

62

57

52

47

 

42

37

32

27

 

 

 

 

54,000

2"

97

93

90

86

 

83

80

76

73

 

 

 

 

72,000

2"

44

40

36

33

 

30

26

23

19

 

 

 

 

72,000

3"

150

150

150

150

 

150

150

150

150

 

 

 

1001'-2000'

90,000

2"

30

26

23

19

 

16

-

-

-

 

 

 

 

90,000

3"

140

135

130

125

 

120

115

110

105

 

 

 

 

108,000

3"

75

70

65

60

 

55

50

45

40

 

 

 

 

126,000

3"

50

45

40

35

 

30

25

20

15

 

 

 

 

54,000

2"

84

81

78

74

 

71

67

64

61

 

 

 

 

72,000

2"

37

34

30

27

 

24

21

18

15

 

 

 

2001'-3000'

72,000

3"

150

150

150

150

 

150

150

150

150

 

 

 

90,000

2"

24

21

18

14

 

11

-

-

-

 

 

 

 

90,000

3"

125

120

115

110

 

105

100

95

90

 

 

 

 

108,000

3"

50

45

40

35

 

30

25

20

15

 

 

 

 

126,000

3"

40

35

30

25

 

20

15

-

-

 

 

 

 

54,000

2"

71

68

64

61

 

58

55

51

48

 

 

 

 

72,000

2"

30

27

23

20

 

17

13

 

 

 

 

 

 

72,000

3"

150

150

150

150

 

150

150

150

150

 

 

 

3001'-4000'

90,000

2"

19

16

12

-

 

-

-

-

-

 

 

 

 

90,000

3"

100

95

90

85

 

80

75

70

65

 

 

 

 

108,000

3"

37

32

27

22

 

17

12

-

-

 

 

 

 

126,000

3"

30

25

20

15

 

10

-

-

-

 

 

 

 

126,000

 

3"

62

57

52

 

47

 

42

37

32

27

 

See Note 2

 

 

54,000

2"

57

54

50

 

47

 

44

40

36

33

 

 

 

 

72,000

2"

25

22

19

16

 

12

-

-

-

 

 

 

4001'-5000'

72,000

3"

150

150

150

150

 

150

150

150

150

 

 

 

90,000

3"

85

80

75

70

 

65

60

55

50

 

 

 

 

108,000

 

3"

85

80

75

 

70

 

65

60

55

50

 

See Note 2

 

 

126,000

 

3"

62

57

52

 

47

 

42

37

32

27

 

 

 

 

54,000

2"

43

40

37

 

33

 

30

27

24

20

 

 

 

 

72,000

2"

21

18

14

11

 

-

-

-

-

 

 

 

5001'-6000'

72,000

3"

150

150

150

150

 

150

150

150

150

 

 

 

90,000

3"

70

65

60

55

 

50

45

40

35

 

 

 

 

108,000

 

3"

85

80

75

 

70

 

65

60

55

50

 

See Note 2

 

 

126,000

 

3"

62

57

52

 

47

 

42

37

32

27

 

 

 

 

54,000

 

2"

110

106

104

 

100

 

96

92

88

84

 

 

 

 

72,000

 

2"

50

46

43

 

40

 

36

32

29

25

 

 

 

6001'-7000'

72,000

 

3"

150

150

150

 

150

 

150

150

150

150

 

See Note 2

 

90,000

 

3"

150

150

150

 

145

 

140

135

130

125

 

 

 

108,000

 

3"

85

80

75

 

70

 

65

60

55

50

 

 

 

 

126,000

 

3"

62

57

52

 

47

 

42

37

32

27

 

 

 

 

54,000

 

2"

97

93

90

 

86

 

83

80

76

73

 

 

 

 

72,000

 

2"

50

46

43

 

40

 

36

32

29

25

 

 

 

7001'-8000'

72,000

 

3"

150

150

150

 

150

 

150

150

150

150

 

See Note 2

 

90,000

 

3"

150

150

150

 

145

 

140

135

130

125

 

 

 

108,000

 

3"

85

80

75

 

70

 

65

60

55

50

 

 

 

 

126,000

 

3"

60

55

50

 

45

 

40

35

30

25

 

 

 

 

54,000

 

2"

84

81

78

 

74

 

71

67

64

61

 

 

 

 

72,000

 

2"

41

38

34

 

31

 

28

24

21

17

 

 

 

8001'-9000'

72,000

 

3"

150

150

150

 

150

 

150

150

150

150

 

See Note 2

 

90,000

 

3"

150

150

150

 

145

 

140

135

130

125

 

 

 

108,000

 

3"

70

65

60

 

55

 

50

45

40

35

 

 

 

 

126,000

 

3"

45

40

35

 

30

 

25

20

15

 

 

 

 

 

54,000

 

2"

71

68

64

 

61

 

58

55

51

48

 

 

 

 

72,000

 

2"

35

31

28

 

25

 

21

18

15

-

 

 

 

9001'-10000'

72,000

 

3"

150

150

150

 

150

 

150

150

150

150

 

See Note 2

 

90,000

 

3"

150

150

150

 

145

 

140

135

130

125

 

 

 

108,000

 

3"

55

50

45

 

40

 

35

30

25

20

 

 

 

 

126,000

 

3"

35

30

25

 

20

 

15

10

-

-

 

 

NOTE 1: The table assumes the use of sweep elbows. If using hard 90? elbows, the vent length should be decreased an additional 3 feet for every elbow used.

NOTE 2: The shaded portions of the table require the high altitude pressure switch in order to operate the furnace at the listed vent lengths.

Page 10

Installer’s Information Manual

Image 10 Contents
?? What to do if YOU Smell GAS Important Safety Rules Table of ContentsMeeting Codes Determining Best Furnace LocationFurnace Dimensions and Clearances Providing Venting and Combustion AIR PVC Pipe Installation InstructionsGeneral Venting Guidelines Direct or NON-DIRECT VENTING? Termination Location and ClearancesExisting Vent Considerations United StatesDirect Venting Instructions two pipe system Determining Vent LengthAltitude Furnace Pipe See Note Input DIANON-DIRECT Venting Instructions one pipe system DIRECT-VENT TerminationAllowable Pipe Length feet NON-DIRECT Vent Termination Combustion and Ventilation AIR non-direct ventUnconfined Space Installation non-direct vent Area PER Diameter Given Pipe Opening Testing for Leaks Installing GAS PipingInstallation Condensate DrainInstalling Electrical Wiring Volt WiringFurnace Wiring Diagram Sequence of Operation Installing Duct System Selecting and Installing Filter CabinetsHorse AIR Filter Velocity Filter CabinetsGAS Motor Disposable High WashableChecks Before Starting Furnace GAS Supply Pressure and Pilot AdjustmentPilot Flame Adjustment Checking GAS Supply PressureChecking GAS Input Rate Manifold Pressure AdjustmentNatural GAS Input Rate Determining Correct Orifice Size Derating for High AltitudePropane LP GAS Input Rate GAS Changing Main Burner OrificesHeating Value Measuring Duct System Static Pressure Adjusting Blower SpeedWire Color GAS Motor AIR Conditioning Tonnage Input SizeMeasuring AIR Temperature Rise Checking ControlsSetting Blower Timings Maintaining Furnace in Good Working OrderAccessories Other Information Publications
Related manuals
Manual 27 pages 9.71 Kb