HP 11744195 manual Operation

Page 15

Chart Environmental Chambers

Operation

Operation

Check system functions and your understanding of the system by following these steps with an empty thermal enclosure before installing the product to be tested.

1.Verify that all utilities are on-line before operating equipment. Liquid nitrogen is required for proper cooling. (Empty or low LN2 tanks produce a mixture of liquid and vapor which will not properly cool the chamber.) Proper voltage and phase electrical supply are necessary for full heating capability. These requirements are listed in the Specifications section.

2.With all function switches in OFF position, connect power to the chamber.

3.Be sure chamber enclosure door is closed securely.

4.Turn the Control Power switch to the ON position.

5.Press Reset push-button to enable control circuits.

6.Adjust temperature set points on the temperature controller to achieve desired internal temperature.

￿ Operator Control Switches

The control console has several selector switches and buttons. The switches/buttons are

identified on the following picture.

2

3

 

1

5

These switches/buttons provide the following control:

1.Watlow Controller

Controls the internal chamber heating, cooling, circulations fans, air purge and window heaters.

10

Image 15 Contents
Chart INDUSTRIES, INC Isis Chamber USER’S Manual Overview ServiceSafety First Chart Environmental Chambers Overview Table of Contents List of Tables Safety Information Description of Safety Features M p e r a t u r e Specifications and Utility RequirementsFeatures Watlow Series 96 temperature controller System Installation Chart Environmental Chambers System Installation Chart Environmental Chambers System Installation Operation Chart Environmental Chambers Operation Entering Temperature Set Points Heating/Cooling Indicators System Maintenance Chart Environmental Chambers System Maintenance Replacement Parts Warranty
Related manuals
Manual 22 pages 63.76 Kb