United States Stove 2000, 2500 instruction manual Factory Built Chimney

Page 10

FACTORY BUILT CHIMNEY :

When a metal prefabricated chimney is used, the manufacturer’s installation instructions must be followed. You must also purchase (from the same manufacturer) and install the ceiling support package or wall pass-through and “T” section package, firestops (where needed), insulation shield, roof flashing, chimney cap, etc. Maintain proper clearance to the structure as recommended by the manufacturer. The chimney must be the required height above the roof or other obstructions for safety and proper draft operation.

10

Ussc

Image 10
Contents Ussc Congratulations Tools and Materials Needed For Installation Blower Assembly Instructions Pedestal Trim AssemblySafety Notice InstallationPositioning the Stove Floor Protector Clearances to Combustibles ModelChimney Connector Stove Pipe Chimney Factory Built Chimney Masonry Chimney Combustible Wall Chimney Connector Pass-Throughs Outside Combustion AIR For use in Mobile HomesTesting Your Wood Woodstove UtilizationIgnition First FiresHeating Reloading To Prevent Creosote Build UPGlass MaintenanceASH Disposal GasketingRepair Parts Key Part No. Description Model Qty HOW to Order Repair Parts United States Stove Company