United States Stove 2500, 2000 instruction manual Tools and Materials Needed For Installation

Page 3

Tools and Materials Needed For Installation

You will need a drill with a 1/8” bit to install sheet metal screws into connector pipe. A 5/16” socket/wrench or screw driver to install pedestal trim, room air deflector, and blower assembly described below. A 1/2” socket/wrench to install flue collar. A non-combustible floor protector as specified in this manual. All chimney and chimney connector components required for your particular chimney installation. For mobile homes, see page 13.

Assembly

Flue Collar Assembly:

1.Mount the flue collar to the top of the unit as shown using the (3) 5/16-18 x 1-1/2 bolts, (3) washers, and (3) weld tabs provided in the parts box.

Room Air Deflector Assembly:

1.Locate the Room Air Deflector. Using the three(3) 1/2 Tek Screws provided, mount the deflector to the unit as shown in the diagram.

Firebrick Configuration:

1. Replace the Firebrick as shown in the illustration below.

Side view of flue collar

5/16-18 x 1-1/2

mount to heater top

BOLT

 

HEATER

 

TOP

 

WELD

 

TAB

Brick Configuration

2000

Ussc

2500

3

Image 3
Contents Ussc Congratulations Tools and Materials Needed For Installation Pedestal Trim Assembly Blower Assembly InstructionsInstallation Safety NoticePositioning the Stove Floor Protector Model Clearances to CombustiblesChimney Connector Stove Pipe Chimney Factory Built Chimney Masonry Chimney Combustible Wall Chimney Connector Pass-Throughs For use in Mobile Homes Outside Combustion AIRWoodstove Utilization Testing Your WoodFirst Fires IgnitionHeating To Prevent Creosote Build UP ReloadingGasketing MaintenanceASH Disposal GlassRepair Parts Key Part No. Description Model Qty United States Stove Company HOW to Order Repair Parts