Lochinvar SPS0250, PS1000 Technology, installation and commissioning, Flat seal screw connections

Page 6

SL-PS Installation & Operation Manual

3 Technology, installation and commissioning

Clamp ring screw connections

Figure 4-1Forward flow multi-functioning instruments

 

Cut the copper pipe to length and deburr.

First, slide the clamp ring nut over the pipe, then slide the clamp ring.

Insert the prepared pipe into the screw connection until its stop is reached.

Tighten clamp ring nut by hand.

Use open-ended wrench to tighten clamp ring screw connection (approx. 33 Ft lb), re-tighten if necessary.

When tightening the clamp ring screw connection, use two wrenchesusing one wrench to prevent the pumping station from turning.

Flat seal screw connections

All pre-fitted solar station screw connections are firmly tightened in the factory so that they do not need to be retightened.

Torque levels when tightening flat seal screw connections using AFM 34 flat seals, s = 2mm.

3/4" screw connection 26 Ft. lb

1" screw connection 40 Ft. lb

1 1/4" screw connection 66 Ft. lb

1 1/2" screw connection 96 Ft. lb

Operation, multi-function ball valve and check valve

The forward flow ball valve must be open for filling, flushing and bleeding solar systems with a filling and flushing pump. The return ball valve should be closed.

Both flow checks should be opened in order to drain the solar system (thermometer handles in 45° position).

The two mult-function ball valves must be fully open in order to operate the solar system (turn the red and blue thermometer handles counter-clockwise until the stop is reached).

SETTING FOR OPERATIONS,

DRAINING

SERVICE

FILLING, FLUSHING, DRAINING

FLOW CHECK OPEN

BALL VALVE

FLOW CHECK CLOSED

BALL VALVE 1/2 OPEN

CLOSED

BALL VALVE OPEN

 

 

Figure 4-2Return multi-functioning instruments

SETTING FOR OPERATIONS

DRAINING

SERVICE, FILLING FLUSHING

FLOW CHECK CLOSED

FLOW CHECK OPEN

BALL VALVE CLOSED

BALL VALVE OPEN

 

BALL VALVE 1/2 OPEN

 

6

Image 6
Contents Installation and Operation Manual Solar Pump StationContents General Information Solar Control unit Installation kitSolar Station Technical documentationInstalling the relief valve Installing the solar stationInstalling the solar station on a wall Installation, connection lines to tank and collectorTechnology, installation and commissioning Flat seal screw connectionsOperation, multi-function ball valve and check valve Commissioning the solar system Filling, flushing and bleedingPressure loss and residual delivery height SPS0250VFS 1-12 output signal flow VFS flow sensorTechnical data for solar station Designation SPS0250 / SPS0500 SPS1000Designation SPS0250 / SPS0500 SPS1000 Component breakdown SPS0250/ SPS0500SPS1000 Air separator ServiceDraining the system Clamp ring screw connectionsMotor blocked Faults, causes and rectificationPump doesn’t run when power is switched on Pump NoiseRevision Notes Revision a ECO C06520 initial release