Lochinvar PS1000, SPS0500 operation manual Pressure loss and residual delivery height, SPS0250

Page 8

SL-PS Installation & Operation Manual

5 Pressure loss and residual delivery height

Figure 5-1

SPS0250

Residual delivery height [Ft]

Solar group with Grundfos UPS 25-58U pump (and GF sensor 0.5-3 GPM) residual delivery height

25

20

15

10

5

Max. residual delivery height pressure drop of components

0

0,0

0,5

1,0

1,5

2,0

2,5

3,0

3,5

4,0

Volumetric flow rate [GPM]

Figure 5-2

SPS0500

Residual delivery height [Ft]

Solar group with Grundfos UPS 25-99U pump (and GF-Sensor 0.5-10.5 GPM) residual delivery height

35

30

0

Max. residual delivery height pressure drop of components

Figure 5-3

SPS1000

 

0,0

0,5

1,0

 

1,5

2,0

2,5

 

3,0

3,5

4,0

4,5

 

5,0

5,5

6,0

6,5

 

7,0

7,5

8,0

 

 

 

 

 

 

 

 

Volumetric flow rate [GPM]

 

 

 

 

 

 

 

 

 

Solar group with Grundfos UP 25-120U pump

 

 

Max. residual delivery height

 

 

 

 

pressure drop of components

 

(and GF-Sensor 0.5 - 10.5 GPM) residual delivery height

 

 

 

 

 

 

 

 

 

40

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

35

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

[Ft]

30

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

height

25

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

delivery

20

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Residual

15

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0,0

0,5

1,0

1,5

2,0

2,5

3,0

3,5

4,0

4,5

5,0

5,5

6,0

6,5

7,0

7,5

8,0

8,5

9,0

9,5

10,0

 

 

 

 

 

 

 

 

Volumetric flow rate [GPM]

 

 

 

 

 

 

 

8

Image 8
Contents Installation and Operation Manual Solar Pump StationContents General Information Installation kit Solar StationSolar Control unit Technical documentationInstalling the solar station Installing the solar station on a wallInstalling the relief valve Installation, connection lines to tank and collectorOperation, multi-function ball valve and check valve Technology, installation and commissioningFlat seal screw connections Commissioning the solar system Filling, flushing and bleedingPressure loss and residual delivery height SPS0250VFS 1-12 output signal flow VFS flow sensorTechnical data for solar station Designation SPS0250 / SPS0500 SPS1000Designation SPS0250 / SPS0500 SPS1000 Component breakdown SPS0250/ SPS0500SPS1000 Service Draining the systemAir separator Clamp ring screw connectionsFaults, causes and rectification Pump doesn’t run when power is switched onMotor blocked Pump NoiseRevision Notes Revision a ECO C06520 initial release