Lochinvar TNR-I&S-02 Anode Inspection and Replacement, Drain Valve and Tank Access Panel

Page 19

TNR-I&S-02

ANODE INSPECTION AND REPLACEMENT

This water heater is equipped with multiple sacrificial anodes. Anodes protect the glass-lined tank from corrosion by sacrificing themselves through electrolysis. When the anode material is consumed, there is no more protection and corrosion of the tank accelerates.

Inspection of the anode every 6 months allows you to identify the rate of anode degradation. The anode should be replaced when its diameter is 3/8 of an inch, or annually which ever is first. Aggressive, very hot and softened water causes rapid consumption of the anode requiring frequent inspections. The replacement anodes rods are available from your local distributor.

To inspect or replace an anode:

The anodes on this water heater are easily accessible from the top of the water heater making replacement simple and quick. Use the following procedure to remove and inspect the anodes.

1.Drain the heater. Refer to DRAINING THE WATER HEATER instructions in this section.

2.Flush the heater. Refer to FLUSHING THE WATER HEATER instructions in this section.

3.Remove the combustion surround top by unlatching.

4.Remove the second pass access cover. (If equipped)

5.Remove the second pass insulation.

6.Remove the second pass collector cover.

7.Remove the anode using a socket of the appropriate size. Sometimes a breaker bar will need to be used. DO NOT use an impact wrench.

8.Inspect and replace the anode as required. Use pipe tape or sealant when reinstalling the anode.

9.Close the drain valve. Open a hot water fixture to allow air to escape. Open the cold water supply to water heater and allow the tank to fill. Follow the lighting instructions.

10.Check your anode and drain valve for leaks.

11.Replace second pass collector cover. Make sure to clean off any sealant and reseal before fastening.

12.Replace second pass insulation.

13.Replace second pass access cover.

14.Replace combustion surround top and latch it securely in place.

DRAIN VALVE AND TANK ACCESS PANEL

The water heaters are equipped with a ¾ inch drain valve. An access panel covers the cleanout opening in the tank which is sealed by a gasket and cover.

RELIEF VALVE

At least twice a year, the temperature and pressure relief valve should be checked to ensure that it is in operating condition. To check the relief valve, lift the lever at the end of the valve several times. The valve should seat properly and operate freely.

If water does not flow, remove and inspect for obstructions or corrosion. Replace with a new valve of the recommended size as necessary. A thorough inspection of the valve should be performed at least every three years by removing the temperature and relief valve from the tank. Do not attempt to repair the valve, as this could result in improper operation and a tank

explosion. In areas with poor water conditions, it may be necessary to inspect the T&P valve more often than the recommended maintenance schedule.

CAUTION

Before manually operating the valve, make sure that a drain line has been attached to the valve to direct the discharge to an open drain. Failure to take this precaution could mean contact with extremely hot water passing out the valve during this checking operation.

If the temperature and pressure relief valve on the water heater discharges periodically or continuously, it may be due to thermal expansion of water in a closed water supply system, or, it may be due to a faulty relief valve.

Thermal expansion is the normal response of water when it is heated. In a closed system, thermal expansion will cause the system pressure to build until the relief valve actuation pressure is equaled. Then, the relief valve will open, allowing some water to escape, slightly lowering the pressure.

Contact your water supplier or local plumbing inspector on how to control this situation.

WARNING

Above all, do not plug the temperature and pressure relief valve. This is not a solution and can create a hazardous situation.

VENT AND AIR INTAKE SYSTEM

Examine the vent and air intake system every 3 months. Points of inspection are as follows:

1.Check for obstructions and/or deterioration of vent piping and vent terminal. Replace immediately where needed.

2.Vent pipe and vent hood screen should be cleaned of any foreign material. The screen is located inside the vent hood outlet and is accessible from the outside of the hood. DO NOT reach inside the vent hood when the water heater is in operation.

3.Check all vent system connections for leakage and reseal as required.

COMBUSTION SYSTEM INSPECTION

Inspect the operation of the combustion system monthly. Use the following procedure to inspect the combustion system.

1.Turn off the main power switch of the water heater.

2.Adjust the thermostat to the Min. setting.

3.Remove the top of the combustion surround by unlatching it.

4.While observing the ignition module, turn on the main power switch.

5.Adjust thermostat to the Max. setting.

6.Watch the LED’s light as the controller goes through the S-OP as previously described.

7.Upon ignition, observe the main burner flame.

8.Readjust thermostat to previous setting.

9.Replace combustion surround top and latch it securely in place.

1 9

Image 19
Contents General Information Table of ContentsLocation Installation InstructionsConfined Space AIR RequirementsMechanical Exhausting of Room AIR Unconfined SpaceInjury. The water is under pressure and may splash Result from excessive temperature and pressuresWater Connections Instructions for ConnectionsApproximate TIME/TEMPERATURE Relationships in Scalds Approximate Time/Temperature Scald ChartScalding Venting Direct Vent InstallationVent Terminal Location Exceptions for InstallationsDirect Vent Terminal Location Vent terminal must not terminateFollow the following procedure to vent through the wall Horizontal InstallationVertical Installation Follow the following procedure to vent through the roofDetermining required vent length Power Vent InstallationPower Vent Terminal Location RatedTypical Vertical Power Vent System Installation Total vent length can not exceed Max. Vent ength in Table Maximum Vent Length DeterminationRain Cap to Small Vent Pipe Ass’y Initial Preparation Vent Pipe PreparationSelection of Materials GAS Pressure Regulation GAS ConnectionsElectrical Connections GAS Meter Size Natural GAS onlySequence of Operation Wiring Diagram and SchematicOperating Instructions General Instructions To Fill the Water HeaterLighting Instructions Burner Flame Check MaintenanceMaintenance Schedule GeneralSediment and Lime Scale Removal Flushing Water HeaterDraining Water Heater Filling Water HeaterVent and AIR Intake System Anode Inspection and ReplacementDrain Valve and Tank Access Panel Relief ValveCheck Collector Limit Switch as previously mentioned Replace the switchMake sure that the temperature of the tank is cool Times, call service