Slant/Fin S-150, SX-210, SX-150 dimensions Wiring Diagram Intermittent Ignition IID

Page 15

Sentry

15

CAUTION: Label all wires prior to disconnection when servicing controls.

Wiring errors can cause improper and dangerous operation. “Verify proper operation after servicing.”

WIRING DIAGRAM — INTERMITTENT IGNITION (IID)

Image 15
Contents Liquefied Petroleum L.P Propane GAS-FIRED Boilers Installation and Operating InstructionsSentry Boiler Foundation Natural GAS-FIRED Boiler LocationDraft Hood SafetyLiquefied Petroleum L.P. Propane GAS-FIRED Boiler Location Chimney RequirementsInstallation Instructions Before YOU Start to Install Vent Damper InstallationDamper Vane NOW, Proceed AS Follows After InstallationThermostat Heat Anticipator Adjustments Electrical Controls and WiringII. AIR Control System Boiler Room AIR Supply and VentilationWater Piping Circulating SystemsInstructions Safety InformationFor Your Safety Read Before Lighting II. Initial StartOperating Instructions For Your Safety Read Before OperatingBoiler rated input Cubic Feet Water System CheckProviding Protection from Freezing Annual Inspection and CleaningSafety Check for Control System Water Level Check During Heating SeasonPropane GAS S8600M & S8670E Wiring Diagram Continuous Pilot Wiring Diagram Intermittent Ignition IID Sentry Fumes and GAS Odors Cause Remedy Delayed Ignition Cause RemedyBurners will not Shut OFF Cause Remedy Flash Back Burning AT Orifices Cause RemedyIf Replacement Parts are Needed Removal of Existing Boiler from Common Vent System Appendix aSLANT/FIN CORPORATION, Greenvale, N.Y Phone 516