Desa VP5B, VP11A installation manual Installing Heater to Wall, Marking Screw Locations

Page 10

10

INSTALLING TO WALL

Continued

For convenience and efficiency, install heater

where there is easy access for operation, inspection, and service

in coldest part of room

CEILING

36"

Minimum

8" Minimum

From Sides Of

Heater

Right

LeftSide

Side

3" Minimum To Top Surface

Of Carpeting, Tile Or Other

Combustible Material

FLOOR

Figure 4 - Mounting Clearances As Viewed From Front of Heater

INSTALLING HEATER TO WALL

Marking Screw Locations

1. Determine where you will locate heater.

WARNING

Maintain minimum clearances shown in Figure 5. If you can, provide greater clearances from floor and joining wall.

2. Mark two mounting screw locations on wall (see Figure 5).

10 7/8" 7 3/4"

Minimum To

Maintain 8"

Clearance

From Wall

WALL

Mounting

20 1/4"

 

Screw

Minimum To

JOINING

Locations

Maintain 3"

 

Clearance

 

 

 

 

From Floor

FLOOR

Figure 5 - Mounting Screw Locations

100844

Image 10
Contents OWNER’S Operation and Installation Manual What to do if YOU Smell GASContents Safety Information Safety Information Product Identification Local Codes Unpacking Product FeaturesSafety Device Piezo Ignition SystemUnusually Tight Construction Fresh AIR for Combustion and VentilationProducing Adequate Ventilation Unconfined SpaceDetermining FRESH-AIR Flow for Heater Location Determining if You Have a Confined or Unconfined SpaceVentilation AIR Ventilation Air From Inside BuildingVentilation AIR Ventilation Air From OutdoorsCheck GAS Type Installation ItemsLocating Heater Installing Heater to Wall Marking Screw LocationsInstalling Two Mounting Screws Folding AnchorPlacing Heater On Mounting Screws Connecting to GAS Supply External Regulator With Vent Pointing DownPressure Testing GAS Supply Piping System Checking GAS ConnectionsPressure Testing Heater GAS Connections Manual Shutoff ValveFor Your Safety Read Before Lighting Operating HeaterPilot To Select Heating Level Shutting Off Heater Operating Heater Inspecting BurnerPilot Flame Pattern Shutting Off Burner Only pilot stays litODS/PILOT and Burner Orifice Inspecting Burner Cleaning and MaintenanceBurner Flame Pattern CabinetTrouble Shooting Observed Possible Problem Cause RemedyMaintenance, TROUBLE- ShootingLocate and correct all leaks see Checking Gas Connections, Ing statement at Trouble Shooting Technical ServiceTop Parts Not Under Warranty Parts Under WarrantyValve GA5010 Parts List Illustrated Parts BreakdownModel VP11A Warranty Information Keep this Warranty

VP5B, VP11A specifications

Desa VP5B and VP11A are innovative and advanced solutions designed to enhance various applications in the energy sector, offering unique features and technologies tailored to meet the modern demands of efficiency and sustainability.

Desa VP5B is a highly efficient power module that stands out for its compact design and integration capabilities. This system is engineered to provide reliable power supply solutions, making it ideal for both residential and commercial applications. One of its most notable features is its modular architecture, which allows for easy scaling as energy needs grow. The system's efficiency is further enhanced by its use of advanced semiconductor technologies, which minimize energy loss during conversion processes. Moreover, the VP5B supports smart grid technologies, enabling seamless interaction with renewable energy sources, which is increasingly crucial in today's energy landscape.

On the other hand, Desa VP11A is designed for robustness and high performance, catering to environments that demand greater power output. This unit boasts a maximum output capacity that makes it suitable for heavy-duty industrial applications. The VP11A employs cutting-edge thermal management systems, ensuring that it operates within optimal temperature ranges, thus prolonging its lifespan and reliability. This model is also equipped with real-time monitoring systems, allowing users to track performance metrics and make informed decisions to optimize energy usage.

Both models prioritize safety, incorporating multiple safety features such as overload protection, over-voltage, and short-circuit protection. They adhere to international safety standards, which is crucial for ensuring the longevity and performance of the systems in varied operational conditions.

From a technological perspective, Desa has invested in advanced communication protocols that allow for integration with IoT devices. This connectivity gives users the ability to remotely monitor and control their power systems, providing greater flexibility and efficiency. The systems can also be configured to operate in coordination with energy management systems, facilitating better load balancing and energy optimization.

In conclusion, Desa VP5B and VP11A represent the forefront of power module technology, combining efficiency, safety, and modern connectivity. Their unique features and robust characteristics position them as essential tools in advancing sustainable energy solutions across a wide range of applications. As we move toward a more energy-conscious future, these systems offer the performance and reliability needed to meet escalating energy demands.