Empire Products SR-10T-3, SR-18T-3, SR-30T-3 installation instructions SR-10T Clearances

Page 8

SR-10T CLEARANCES

When facing the front of the appliance the following minimum clearances to combustible construction must be maintained.

Left side 6 inches (152mm). Right side 6 inches (152mm). Do not install in alcove or closet.

Rear wall 0 inches (0mm). Ceiling 24 inches (610mm). Minimum vertical clearance from a projection above the appliance (shelves, window sills, etc.) 14 inches (356mm). Maximum horizontal extension of projection above the appliance 12 inches (305mm).

Floor (top surface of carpeting, tile, etc.) 2 inches (51mm).

Provide adequate clearances around air openings.

Adequate accessibility clearances for purposes of servicing and proper operation must be provided.

24 " MIN (610mm)

14" MIN

(356mm)6 " MIN6 "MIN

(152mm)(152mm)

2 " MIN (51mm)

Figure 3 (SR-10T)

12" MAX (305mm)

24 " MIN (610mm)

14" MIN

0" (0mm) CLEARANCE

(356mm)

TO REAR WALL

2 " MIN (51mm)

Figure 4 (SR-10T)

Page 8

16009-1-0504

Image 8
Contents Installation Instructions Table of Contents Important Safety Information Safety Information for Users of LP-GAS LP-GAS Warning OdorSpecifications IntroductionWater Vapor a BY-PRODUCT of Unvented Room Heaters Unusually Tight ConstructionPressure Testing of the Gas Supply System GAS SupplyGas Supply Checking Manifold PressureSR-10T Clearances SR-10TSR-18T Clearances SR-30T ClearancesWall Mount Installation On Sheet Rock WallOptional Floor Stand Installation Installation on Rugs and TileFor Your Safety Read Before Lighting Lighting InstructionsMain Burner Flame Characteristics Pilot Flame Characteristics Thermostat OperationOxygen Depletion Sensor Pilot Figure Main Burner OperationAppliance Maintenance Parts List TroubleshootingHOW to Order Repair Parts SR-18T Parts View Parts View SR-30T Optional Blower Installation Isntructions Excessive Blower Wheel NoiseOptional Blower Installation Isntructions Service Notes Mail info@empirecomfort.com