Hubbell Electric Heater Company MSE manual Table of Contents Section Title

Page 3

 

TABLE OF CONTENTS

 

SECTION

TITLE

PAGE #

I

GENERAL DESCRIPTION AND CONSTRUCTION

5

II

INSTALLATION

10

III

SCHEDULED MAINTENANCE AND OPERATION

14

IV

TROUBLESHOOTING

16

V

SERVICING AND REPLACEMENT OF PARTS

18

VI

MISCELLANEOUS CHARTS AND FORMULAS

26

VII

ABS TYPE APPROVAL PROGRAM

28

3

Image 3
Contents Electric Heater Company Hubbell Electric Heater Company BOXSTRATFORD, CT Table of Contents Section Title Page Heating Element Section I General Description and ConstructionTank Tank ConnectionsControl Thermostat Temperature High Limit SwitchLow Water Cut-Off Magnetic ContactorOuter Shell and Insulation OptionsDial Temperature and Pressure Gauge Fused Low Voltage TransformerVacuum Relief Valve Built-in Circuit Breaker On/Off SwitchElectro-Mechanical Timer Individually Fused ElementsSecuring of Heater Water Heater PlacementMounting Dimensions Filling the Heater Piping InstallationFinal Checks Electrical InstallationQuarterly Inspection Section III Scheduled Maintenance and OperationMaintenance and Operation FreezingAnnual Inspection Symptom Probable Cause Corrective Action / Remedy Section IV TroubleshootingPage Surface Temperature High Limit CUT-OFF Section V Servicing & Replacement of PartsImmersion Temperature High Limit CUT-OFF Heating Element Page Surface Mounted Thermostat Immersion Thermostat Magnetic Contactor Relief Valve Formulas Section VI Miscellaneous Charts and Formulas Element ChartTorque Values Section VII ABS Type Approval Program Page Page